Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Design
Spokane, WA 99218

American Rescue Plan Expenditure Category Addressing Drinking Water Transmission
Infrastructure
Bidding
$4,000,000 est. value
Spokane, WA

Frontier Park Horse Arena Cover
Alteration
Bidding
$1,600,000 est. value
WA

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

NorthEast 2nd Avenue Street Improvements and NorthEast Dallas Water Improvements
Infrastructure
Bidding
$365,315 est. value
Camas, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

2022 Valve and Manhole Adjustment Project
Infrastructure
Bidding
$325,000 est. value
Bothell, WA

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

2022 Sewer and Water System Improvements
Infrastructure
Bidding
$2,800,000 to $3,100,000 est. value
Omak, WA

Last Updated 04/19/2022 03:55 AM
Project Title

Reservoir 2 and Water System Improvements

Physical Address View project details and contacts
City, State (County) Bridgeport, WA   (Douglas County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,800,000 to $3,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes construction of a new 237,000-gallon concrete reservoir, installation of approximately 4,800 linear feet of new 12-inch transmission main pipelines, construction of a new booster pump station, construction of a new pressure reducing valve station on 16th Street, construction of a new pressure reducing valve station on 10th Street, modification of an existing pressure reducing valve station on 16th Street, electrical and telemetry improvements at the existing well sites, existing Reservoir 1, and wastewater treatment plant, and backup power to existing wells and proposed booster station.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents