Similar Projects
As-Needed Bulk Waste and Junk Removal Services for the Van Nuys DMV Field Office
Infrastructure
Bidding
Sacramento, CA

Trash Collection, Hauling, and Disposal Services in Fresno, Madera, and Tulare Counties
Infrastructure
Bidding

S205--Solid Waste Disposal Service
Term Contract
Post-Bid
Fresno, CA

The Haskell Stewardship Integrated Resource Timber Contract (IRTC)
Infrastructure
Post-Bid
Quincy, CA

First Street Slope Stabilization Project
Demolition, Alteration
Results
$309,235,613 est. value
Santa Ana, CA

Pacific Electric Right of Way Maintenance Services
Term Contract
Results
$207,232 est. value
CA

Non-Hazardous Wastewater Semi-Solid Algae Hauling and Disposal Services
Term Contract
Bidding
Coalinga, CA 93210

S205--Bridge - Solid Waste Collection Disposal
Term Contract
Post-Bid
Rancho Cordova, Sacramento, CA 95655

Waste Removal and Roll-Off Bin Rental
Term Contract
Results
Herlong, CA 96113

Dockside Recyclable Waste Removal Services at the DMV Headquarters Campus
Term Contract
Bidding
$59,660 est. value
Sacramento, CA 95818

On-Call Pickup, Removal, Clean Up, and Disposal Services Of Hazardous Waste, Environmentally Regulated Waste, and Lab Packed Waste
Infrastructure
Post-Bid

Trash Collection, Hauling and Disposal Services
Infrastructure
Results
CA

Trash Collection, Hauling, and Disposal Services in Modoc County
Infrastructure
Bidding
Alturas, CA

Unsheltered Resident Encampment Clean Up in Los Angeles County - (Metro Region)
Infrastructure
Post-Bid
CA

On-Call Road Materials Hauling Services
Infrastructure
Bidding
Modesto, CA

Reported 05/13/2022 12:00 AM
Project Title

2022 Redding Regional Septage Impoundment 1B Cleanout

Physical Address View project details and contacts
City, State (County) Redding, CA   (Shasta County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work, in general, consists of drying, loading, hauling, and disposing of approximately 1400 tons of septage sludge contained within Impoundment 1B and dike wall butress along the edge of impoundment

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents