Similar Projects
Environmental And Oceanographic Sciences Research And Teaching Facility - University of South Florida
Demolition, New Construction, Renovation, Infrastructure - 85,200 SF
Conception
$50,306,519 CJ est. value
St Petersburg, FL 33701

Interstate 275 Express Lane - Florida Department of Transportation
Infrastructure
Conception
$10,000,000 est. value
Saint Petersburg, FL 33747

Anclote Harbor Apartments
New Construction, Infrastructure - 11,000 SF
Design
$155,400,000 CJ est. value
Tarpon Springs, FL 34689

Anclote Harbor Apartments
New Construction, Infrastructure - 11,000 SF
Design
$155,400,000 CJ est. value
Tarpon Springs, FL 34689

Sea Captain Resort Expansion
Addition, Renovation, Infrastructure
Sub-Bidding
$13,500,000 CJ est. value
Clearwater, FL 33767

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Pinellas County Jail Secure Entry Center (SEC) - Pinellas County
New Construction, Infrastructure
Post-Bid
$14,880,000 CJ est. value
Clearwater, FL 33762

SPC Downtown Parking Operations
Infrastructure
Results
Saint Petersburg, FL

Lift Station No. 42 Replacement
Demolition, New Construction, Infrastructure
Results
$2,247,464 CJ est. value
St Petersburg, FL 33716

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

CASA - Repaving of Parking Lots
Construction
Saint Petersburg, FL 33705

The Miramar Beach Resort
Demolition, New Construction, Infrastructure
Pending Verification
$14,300,000 CJ est. value
St Pete Beach, FL 33707

The Miramar Beach Resort
Demolition, New Construction, Infrastructure
Pending Verification
$14,300,000 CJ est. value
St Pete Beach, FL 33707

Pinellas Trail Loop Phase 4 from 126th Avenue North to Ulmerton Road - County of Pinellas
Infrastructure
Conception
Less than $2,180,830 est. value
Largo, FL 33773

Lake Tarpon Business Center
Demolition, New Construction, Infrastructure - 58,000 SF
Design
$6,300,000 CJ est. value
Tarpon Springs, FL 34689

Last Updated 05/25/2023 10:29 AM
Project Title

Pinellas Bay Way / St Petersburg

Physical Address View project details and contacts
City, State (County) St Petersburg, FL 33715   (Pinellas County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $6,091,557 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Counties: Pinellas Road Name: Sr 682 - Resurfacing Limits: 15200001 Project(S): 44165215201(*) Federal Aid No: N/a Total Roadway Length: 1.759 Miles Contract Days: 285 Total Bridge Length: 0.000 Miles Total Proposal Length: 1.759 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 120 Acquisition Days The Improvements under this Contract consist of milling, resurfacing, widening, base work, curb and gutter, sidewalks, signing and pavement marking, signalization, lighting and incidental construction on State Road 682 from East of State Road 679 to East of 41st Street South in Pinellas County. Prequalification Required. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 001 - SR 682 - Resurfacing

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents