Similar Projects
Seeling Channel Phase 3 Project
Bidding
$15,080,000 est. value
San Antonio, TX 78205

Street Maintenance and Repair Program 2020 - Chip Seal
Bidding
Fair Oaks Ranch, TX 78015

Roadway Paving
Post-Bid
$25,000,000 to $100,000,000 est. value
San Antonio, TX 78234

Airfield Maintenance IDIQ Sources Sought
Post-Bid
$25,000,000 to $100,000,000 est. value
San Antonio, TX 78236

2018-2019 CDBG Funded Reconstruction/Reclamation Task Order Contract Package 17
Results
San Antonio, TX

FY 2019 Asphalt Overlay Task Order Contract Package 2
Results
San Antonio, TX

Mill and Inaly
Bidding
Less than $1,378,179 est. value
TX

West Campus Road Repairs and Related Work
Post-Bid
Less than $342,000 est. value
San Antonio, TX

2019 Reclamation Reconstruction Task Order Contract Package 6
Results
San Antonio, TX 78205

Expand 4 to 6 Lns Divided and Intersect Operations
Bidding
Less than $7,498,046 est. value
TX

Converse Sidewalk Project
Post-Bid
Less than $370,000 est. value
Converse, TX 78109

2019-2020 Task Order Contract for Flatwork Street Improvements Package 2
Term Contract
Results
$1,720,335 est. value
San Antonio, TX

Intersect Oper Improv and incl Widen Cibolo Crk Brdg
Bidding
Less than $6,800,558 est. value
TX

Oakwell Farms Fonthill Way 2018
Post-Bid
$55,000 est. value
TX

2019-2020 Task Order Contract For Flatwork and Street Improvements Package 3
Results
Less than $980,000 est. value
San Antonio, TX

Reported 10/23/2019 12:00 AM
Project Title

2020-2021 Task Order Contracts for Flatwork and Street Improvements Package 4

Physical Address View project details and contacts
City, State (County) San Antonio, TX 78205   (Bexar County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value $980,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description The Project consists of the construction as part of the Department's continuing efforts to expedite project delivery and completion of infrastructure projects citywide, Transportation and Capital Improvements will be utilizing the construction services of contractors on an as needed basis through the use of Task Order Contracts. This Task Order Contract projects includes, but is not limited to, the construction of sidewalks, curbs, wheelchair ramps, retaining walls, asphalt replacement, and any other work required for the completion of the assigned projects located throughout the City.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents