Similar Projects
Design-Build Neabsco-Potomac Commuter Parking Project
New Construction
Post-Bid
$53,328,850 est. value
VA

Y1PZ--Expand Parking Lot T
Post-Bid
$500,000 to $1,000,000 est. value
Salem, VA 24153

HSIP Pedestrian Improvements at Signalized Intersections Phase 1B
Results
Richmond, VA 23221

HSIP Pedestrian Improvements at Signalized Intersections Phase 1B
Results
Richmond, VA 23221

Construct New Terminal Building Site Work - Phase 1
Construction
Winchester, VA 22602

Construct New Terminal Building Site Work - Phase 1
Construction
Winchester, VA 22602

Churchland Academy Parking Lot
Post-Bid
Portsmouth, VA 23703

TAP Sidewalk Improvements
Results
Culpeper, VA 22701

Waynesboro Marketplace - Sitework
New Construction
Construction
Waynesboro, VA 22980

Construction of New Parking Lot at the Johnson Court (VA2-2) Development
Post-Bid
Bristol, VA

Granby Street Bike Bypass at Riverview
Results
Norfolk, VA

Construction of the Main Street Improvements Phase II - B
Post-Bid
Richmond, VA

Parking Lot Reconfiguration Project
Results
Roanoke, VA

FY 21 Curb and Gutter
Post-Bid
Roanoke, VA

Inner Harbor Sidewalk
Results
Cape Charles, VA

Last Updated 06/15/2022 07:03 AM
Project Title

US 522 Pedestrian and Bicycle Safety Improvements(Road Diet)

Physical Address View project details and contacts
City, State (County) Culpeper, VA   (Culpeper County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

US 522 Pedestrian and Bicycle Safety Improvements(Road Diet) located in the Town of Culpeper in Culpeper County, Virginia. The project generally consists of construction activities along US 522 (Sperryville Pike/West Evans Street) between Covington Street and North West Street. The proposed construction activities include the following: 1. A 5’ wide concrete sidewalk with curb & gutter will be constructed on the north side of the roadway between Covington Street and the existing roundabout at the intersection of US 522 with Colonel Jameson Boulevard/Virginia Avenue. 2. Between the existing roundabout at the intersection of US 522 with Colonel Jameson Boulevard/Virginia Avenue and North West Street, the existing roadway will be reduced (Road Diet) from two travel lanes in each direction down to one travel lane in each direction with bicycle lanes in both directions and raised, grassed median islands with street trees and street lighting between new pavement markings for left turn lanes. Sidewalk improvements, including replacement of existing pedestrian ramps, will be constructed on both sides of the roadway as shown on the plans. 3. A mini-roundabout will be constructed at the intersection of US 522 and North Blue Ridge Avenue as part of this project.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents