Similar Projects
Reported 12/22/2021 12:00 AM
Project Title

Phase 1 Distribution System Improvements

Physical Address View project details and contacts
City, State (County) Big Timber, MT   (Sweet Grass County)
Category(s) Heavy and Highway
Sub-Category(s) Landscaping, Sidewalks/Parking Lot, Traffic Signalization
Contracting Method Competitive Bids. Owner to Subcontract.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Asphalt Restoration, Concrete Curb, Gutter Sidewalk Restoration, Traffic Control, Seeding/Landscaping, and Jack Bore

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents