Similar Projects
Brentwood Boulevard Widening North - Phase 1 - 336-31620
Infrastructure
Conception
$7,050,340 est. value
Brentwood, CA 94513

Downtown Alley Rehabilitation - Mid Way - City Of Brentwood
Alteration
Conception
$2,100,000 est. value
Brentwood, CA 94513

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Primrose School - Orchards Shopping Center / Walnut Creek
New Construction, Infrastructure - 12,838 SF
Design
$2,800,000 CJ est. value
Walnut Creek, CA 94598

Pittsburg High School New Softball Field
Infrastructure
Bidding
$3,000,000 CJ est. value
Pittsburg, CA 94565

RFQ D/B - Lake Elementary School Campus Replacement Increment 2
Demolition, New Construction, Infrastructure
Bidding
$38,000,000 CJ est. value
San Pablo, CA 94806

Parking Lot Sweeping and Pressure Washing and/or Steam Cleaning Services at the Concord DMV Field Office
Term Contract
Post-Bid
Concord, CA 94520

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Paving Repairs and Ramps at FHFB
Term Contract
Results
Richmond, CA

Crow Canyon Road Widening Project
Infrastructure
Results
$10,400,000 est. value
San Ramon, CA 94583

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Carmel Townhomes
New Construction, Infrastructure - 23,285 SF
Pending Verification
$6,400,000 CJ est. value
Walnut Creek, CA 94596

Solid Waste Organics Diversion - City of Brentwood
Infrastructure
Conception
$30,000,000 est. value
Brentwood, CA 94513

Valley Rail Project / Altamont Corridor Express- San Joaquin Joint Power Authority
Infrastructure
Design
$404,000,000 CJ est. value
Sacramento, CA 95814

CA NPS 2021(1), Pavement Preservation Bay Area
Term Contract
Post-Bid
$2,000,000 to $3,000,000 est. value
Danville, Martinez, Mill Valley, San Francisco, CA 94526

Last Updated 09/28/2022 12:38 PM
Project Title

Brentwood Various Streets and Roads Preservation

Physical Address View project details and contacts
City, State (County) Brentwood, CA 94513   (Contra Costa County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $609,400 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is located at Lone Tree Way from Brentwood Boulevard to Medallion Drive, excluding the portion located in unincorporated Contra Costa County, and is described as follows: Project rehabilitates the existing pavement and handicap ramps on Lone Tree Way from approximately 200' West of Medallion Drive to O'Hara Avenue and Lone Tree Way from Virginia Drive to Brentwood Boulevard. License. This Project requires a valid California contractors license for the following classification(s): Class A. DIR Registration. City may not accept a Bid Proposal from or enter into the Contract with a bidder, without proof that the bidder is registered with the California Department of Industrial Relations (DIR) to perform public work pursuant to Labor Code 1725.5, subject to limited legal exceptions. DBE Goal. This Contract is subject to a DBE participation goal of fourteen percent (14%). The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashiers or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that within ten days after City issues the Notice of Potential Award, the successful bidder will execute the Contract and submit the payment and performance bonds, insurance certificates and endorsements, and any other submittals required by the Contract Documents and as specified in the Notice of Potential Award. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. These prevailing rates are on file with the City and are available online. Each Contractor and Subcontractor must pay no less than the specified rates to all workers employed to work on the Project. The schedule of per diem wages is based upon a working day of eight hours. The rate for holiday and overtime work must be at least time and one-half. The City may reject a bid submitted by a bidder that did not obtain the Contract Documents from the City as required.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents