Similar Projects
Cooling Tower Replacement
Post-Bid
Less than $2,700,000 est. value
Boca Raton, FL 33431

Electric Utility Services for Various Locations
Post-Bid
Marianna, Tallahassee, FL - Jesup, GA - Manchester, Pine Knot, KY - Ayer, MA - Guaynabo, PR - Bennettsville, SC

Preventive Maintenance and Repair Services for Heating, Ventilation, Air Conditioning and Refrigeration Equipment - Chilled Water Systems and Secure Locations
Term Contract
Results
Kissimmee, FL 34741

Hurricane Irma Related Repairs at the Tri-Rail Station Ceiling Slats and Lighting
Results
Less than $54,545 est. value
Hialeah, FL 33147

Mechanical Renovations at Horizon Middle School & Kissimmee Middle School
Post-Bid
Less than $1,900,000 est. value
Kissimmee, FL 34746

Annual Electrical Services for City Buildings
Term Contract
Results
Less than $750,000 est. value
Jacksonville, FL

CD 1.11 - Emergency Generators 1 thru 4 Rehab SDWWTP
Post-Bid
Less than $2,154,000 est. value
Miami, FL 33190

J--Service: Replacement of Trailer Air Conditioner Units
Results
Gainesville, FL 326081135

HVAC Maintenance
Post-Bid
Jacksonville, FL 32203

Purchase of Electrical Switchgears
Results
New Smyrna Beach, FL 32168

J--U.P.S. Preventative Maintenance Services (VA-19-00016829) Base Year with Four (4) Option Years
Results
Palm Beach Gardens, FL 33410

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

J--GM-Vacuum Furnace Preventative Service
Results
Jacksonville, FL 32212

Hood and Duct Cleaning Service
Results
Hurlburt Field, FL 32544

Lift Stations 16A, 34, 37 and 2E Generators
Results
Less than $576,000 est. value
Tamarac, FL

Reported 01/15/2020 12:00 AM
Project Title

Altha Public School Miscellaneous Projects

Physical Address View project details and contacts
City, State (County) Altha, FL 32421   (Calhoun County)
Category(s) Single Trades
Sub-Category(s) Electric, HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

This work includes the replacement of exhaust fans at the Altha Gymnasium and the replacement of exterior lighting fixtures on Altha`s campus.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents