Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFP Design - Engineering Services for Cell 6 at the Southern Solid Waste Management Center (SSWMC)
Infrastructure
Conception
$1,000,000 CJ est. value
Georgetown, DE 19947

Turnberry - Unity Branch Subdivision
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Harbeson, DE 19951

Fairmont Autumdale Subdivision
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Harbeson, DE 19951

Bethany Y2022 Street Paving
Infrastructure
Bidding
$2,000,000 CJ est. value
Bethany Beach, DE 19930

Bethany Y2022 Street Paving
Infrastructure
Bidding
$2,000,000 CJ est. value
Bethany Beach, DE 19930

Assawoman Lakes
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Georgetown, DE 19947

Assawoman Lakes
Infrastructure
Sub-Bidding
$200,000 CJ est. value
Georgetown, DE 19947

Open-End Pedestrian Access Routes and Sidewalk Improvements
Infrastructure
Post-Bid

West State Street Sidewalk Replacement
Infrastructure
Post-Bid
Millsboro, DE 19966

BR 3-155N and S on SR1 Over Broadkill River
Results
DE

Pavement Preservation, Open End, Sussex/Kent, FY21-22
Results

Black Hog Village Retail
New Construction, Infrastructure - 21,818 SF
Pending Verification
$4,000,000 CJ est. value
Lewes, DE 19958

Black Hog Village Retail
New Construction, Infrastructure - 21,818 SF
Pending Verification
$4,000,000 CJ est. value
Lewes, DE 19958

Inland Bay Regional Wastewater Facility (IBRWF) - Loop Project - Sussex County
Infrastructure
Conception
$6,500,000 CJ est. value
Millsboro, DE 19966

Last Updated 08/08/2022 12:33 PM
Project Title

Magnolia Street Parking Lot and Bulkhead Rehabilitation

Physical Address View project details and contacts
City, State (County) Milton, DE 19968   (Sussex County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $1,246,714 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.capegazette.com/article/milton-officials-propose-property-tax-increase-2023-budget/243970 Milton residents could see a property tax increase as part of the fiscal year 2023 budget, the town’s third increase since 2015. Under the proposal, the tax rate would go from $0.252 per $100 of assessed value to $0.299 per $100 of assessed value, an 18% increase. Property taxes are Milton’s largest revenue generator; through FY 2022, the town is expected to take in $1.235 million, about $15,000 more than expected. With the increase, FY 2023 is estimated to generate $1.5 million. In addition, the proposed budget calls for a 15% increase in business licenses, an increase in waste and recycling fees from $61.50 per quarter to $63.50 per quarter and a hike in water availability and usage fees. It should be noted that trash and recycling fees are stipulated in the town’s contract with provider GFL Environmental, while revenues raised by water fees are restricted to being spent on improvements to the water system. Town Manager Kristy Rogers’ budget shows the town running a small surplus, with $4.75 million in revenue against $4.69 million in expenditures. Among other notable items in the budget is using $250,000 in realty transfer tax for operational expenditures for public safety. Transfer tax revenue is restricted by state law to certain uses. Rogers has said in the past that her projected revenue is not exactly what she thinks the town will take in, but what the town intends to spend it on, with the rest going into reserve funds that the town has recently used for capital improvement projects. The draft budget estimates $587,000 in transfer tax revenue. While typically tax increases are used to fund large projects, that’s not the case with this budget. At council’s Aug. 1 meeting, Mayor John Collier said, “This is a difficult budget year for us. Quite frankly, we’ve spent a lot of years cutting corners and holding taxes at zero. We can’t cut corners anymore. I don’t see any way we can provide the same level of service that people are comfortable receiving without raising taxes.” Collier said the main large-scale capital improvement projects are ones carried over from previous years, such as the Magnolia Street bulkhead and drainage project, which started July 27, with a price tag of $1.2 million. While half of that cost is funded through a state grant, the town’s share of the project is larger than expected due to supply chain issues and increased costs of materials. “This is not us trying to get into your pockets,” Collier said. “This is just us trying to provide citizens what you’re accustomed to having.” He said the town has been fortunate to receive funding from the federal American Rescue Plan Act in order to plan for a new well and treatment facility on town-owned land on Federal Street, as well as a realty transfer tax grant from Sussex County. Collier said town officials are trying to put that money to use for citizens with improvements to the water system and to the streets and sidewalks. The town previously increased property taxes in fiscal years 2015 and 2021, with taxes going up by 11% in 2015 and by 5% in 2021. The budget is under review by the town’s finance committee, with council likely to hold a public hearing at its Monday, Aug. 15 meeting. Following that hearing, additional changes will be made as the budget is finalized. Under town code, the budget must be in place by Sept. 30, with the 2023 fiscal year beginning Oct. 1. _________________________________________________________ The work consists of site construction rehabilitation of the bulkhead along the Broadkill River and the Magnolia Street parking lot. The bulkhead repair involves reconstruction of approximately 85 feet of the sheet pile bulkhead, modification of the storm sewer pipe penetration, and restoration of Governor's Walk and boardwalk. The parking lot construction involves demolition and reconstruction to provide a stormwater basin, stormwater pumping station, and reconfigured parking lot area. The construction work also includes sidewalk and curb replacement along Magnolia Street. No Bidder may withdraw his bid within sixty days after the actual date of the opening thereof. The right is reserved, as the interests of the Town of Milton may appear, to reject any and all bids, to waive any informality in bids received, and to accept or reject any items of any bid. The Town of Milton reserves the right to extend the time and place of Bid Opening on not less than two calendar days' notice by certified delivery, electronic delivery, or facsimile.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents