Similar Projects
Pflugerville Water Pipeline Project
New Construction, Infrastructure
Conception
$86,000,000 est. value
Pflugerville, TX

Pump Rehab Lift Station 1 and 2
Infrastructure
Bidding
Del Valle, TX 78617

Motors, Pumps, and Electrical Cables for Water Wells Annual Contract
Term Contract
Bidding
Amarillo, TX

Certification and Calibration of Well Water Meters
Post-Bid
Houston, TX 77072

Pump Replacement Sprint For Lm6000
Post-Bid
Austin, TX 78767

Water Treatment Plant Facilities Pump and Motor Maintenance and Repair Services
Results
Less than $2,762,500 est. value
Round Rock, TX 78664

J045--Reline Main Irrigation Well and Replace Vertical Turbine Pump at Houston National Cemetery. Project Number 851-NRM20-203
Results
$100,000 to $250,000 est. value
Houston, TX

Remove, Repair, and Reinstall Pump
Infrastructure
Bidding
Amarillo, TX 79118

Vitruvian Park Well Pad Construction
Post-Bid
Addison, TX 75001

Pump Replacement
Results
$8,461 est. value
Dallas, TX 75202

Deer Creek Phase IX - Water Wells
Infrastructure
Bidding
$400,000 est. value
Annetta, TX

Air Stripping Tower at Water Well No. 2
Post-Bid
Houston, TX

Scott Street Well Pump and Motor Removal/Reinstallation
Results
$6,265 est. value
Athens, TX 75751

Water Well No. 5
Infrastructure
Bidding
TX

Well 3 and 3A Well Head Improvements
Post-Bid
Less than $1,900,000 est. value
Lake Jackson, TX

Last Updated 03/08/2022 08:12 AM
Project Title

Well No. 4 Water System Improvements

Physical Address View project details and contacts
City, State (County) Lytle, TX   (Atascosa County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction include the installation of Well No. 4 pump and motor, chemical feed system and all required piping and electrical connections; the replacement of ductile iron piping and valves on existing Well No. 2 discharge piping; repairs to ground storage tank roof and installation of ductile iron piping and valves at the Water Treatment Plant. All necessary appurtenances will be incorporated into the construction.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents