Similar Projects
New Franklin City Hall
New Construction - 112,500 SF
Conception
$74,500,000 est. value
Franklin, TN

New Chattanooga Federal Courthouse - City Of Chattanooga
New Construction, Infrastructure
Conception
$218,000,000 CJ est. value
Chattanooga, TN 37402

Demolition/Renovation of City Hall - City of White House
Demolition, Renovation, Infrastructure
Design
$500,000 CJ est. value
White House, TN 37188

Remodel of the Rutledge Conference/Court Room
Build-out
Bidding
$100,000 CJ est. value
Rutledge, TN 37861

Warren County Clerk and Masters Office Renovation
Renovation
Bidding
$300,000 CJ est. value
McMinnville, TN 37110

Putnam County Justice Center Expansion and Renovation - All Trade Packages
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$500,000 CJ est. value
Cookeville, TN 38501

New Courtroom for Juvenile Court
Renovation
Post-Bid
Jackson, TN 38301

Bedford County Courthouse
Renovation
Post-Bid
Shelbyville, TN 37160

Hamblen County Justice Center
New Construction - 199,000 SF
Results
$25,000,000 est. value
Morristown, TN 37814

Toilet Facility Improvements
Renovation
Results
$180,000 est. value
Elizabethton, TN

Renovations for the New City Hall
Renovation
Bidding
$40,000 CJ est. value
Greenfield, TN 38230

City Hall
Renovation
Post-Bid
Brownsville, TN 38012

Macon County Courthouse Restoration Project
Renovation
Results
Lafayette, TN

City Hall Addition
Addition
Post-Bid
Huntingdon, TN 38344

Courtroom Renovations
Renovation
Results
Savannah, TN 38372

Last Updated 08/30/2022 07:05 AM
Project Title

Anderson County Courthouse, County Clerk & Archive Renovation

Physical Address View project details and contacts
City, State (County) Clinton, TN 37716   (Anderson County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $989,900 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall furnish all plant, labor, materials, equipment, and services necessary for and reasonably incidental to the complete installation of all electrical work as shown on the drawings and specified herein. Bidders must be licensed and qualified per state law. Five percent (5%) Bid Security is required in the form of a Bid Bond or check (certified or cashier's) made payable to Blankenship & Partners. Nondiscrimination policy applies. Accept the conditions for liquidated damages in the amount of $500.00 per calendar day. Final, liquidated damages settlement statement. The Work consists of the following: 1. Provide labor materials, equipment, services, and perform work necessary for the construction of the Project located in Clinton, Tennessee. 2. Project consists of selective demolition in on the first floor and third floor of the existing building, and construction of those spaces into new configurations. Sequencing of the work in coordination with the Owner is required to allow continued operation of County government. Areas for demolition include the County Clerk's office and adjacent spaces and the Archives. New spaces to be constructed, relocated, or reconfigured include the County Clerk's office and adjacent spaces, the Archives, and new Witness Rooms. 3. The work includes, but is not necessarily limited to, selective demolition, structural steel, masonry, aluminum storefront, aluminum entrances, interior metal stud gypsum board partitions, electrical, lighting, telecommunications, interior finishes, and all necessary incidental work.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents