Similar Projects
Fort Worth Academy Middle School
Renovation, Addition - 19,410 SF
Design
$2,700,000 est. value
Fort Worth, TX 76132

IDEA Rise Public School
New Construction - 27,000 SF
Design
$5,000,000 est. value
Fort Worth, TX 76116

Rocketship Elementary School
New Construction - 45,758 SF
Sub-Bidding
$4,600,000 est. value
Fort Worth, TX 76105

O D Wyatt High School Renovation
Renovation
Post-Bid
Fort Worth, TX

Arlington Heights High School Addition/Renovation
Renovation, Addition
Post-Bid
Fort Worth, TX 76107

Addition and Renovations to Central and Hurst Junior High
Renovation, Addition
Results
$27,700,000 est. value
Bedford, TX

Addition and Renovations to Harwood and Bedford Junior High
Renovation, Addition
Results
$30,800,000 est. value
Bedford, TX 76210

Nolan Catholic High School
Renovation
Construction
$1,000,000 est. value
Fort Worth, TX 76103

Euless Junior High Additions and Renovations
Renovation, Addition
Construction
Bedford, TX

South Hills High School Addition/Renovation
Renovation, Addition
Post-Bid
$39,900,000 est. value
Fort Worth, TX 76133

Building Addition
Results
$37,670,000 est. value
Everman, TX 76140

North Side High School Renovation
Renovation
Construction
Less than $24,375,960 est. value
Fort Worth, TX 76164

Donna Shepard Intermediate School Renovation
Post-Bid
$2,902,000 est. value
Mansfield, TX 76063

Construction Manager at Risk for Keller ISD
Results
Keller, TX 76248

New Music Center & Senior High School Renovation
Renovation, Addition
Construction
$27,145,000 est. value
Southlake, TX

Reported 02/04/2021 12:00 AM
Project Title

Rosemont Schools Bathroom Renovation - 2 Schools

Physical Address View project details and contacts
City, State (County) Fort Worth, TX 76110   (Tarrant County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,202,500
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

HUB Goal: 25% Demolition, new plumbing fixtures, to include some revised locations and fixture types, new floor drains and existing floor drain replacements, new mechanical equipment, installation of isolation valves in each restroom, new lighting, hand dryers, doors, frames and hardware, toilet partitions, toilet accessories, gypsum board ceilings, tile walls and floor coverings. The work shall also include removal and repair of masonry partitions for plumbing, new masonry partitions, repair of drywall partitions, and repair of existing plaster and gypsum board ceilings.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 08 - Openings, Doors and Frames.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents