Similar Projects
Overland Park Arboretum Nature Trail - City of Overland Park
Infrastructure
Conception
$3,050,000 est. value
Bucyrus, KS 66013

Ridgeview Corporate Centre
New Construction, Infrastructure - 245,000 SF
Design
$141,500,000 CJ est. value
Olathe, KS 66061

143-Met
New Construction, Infrastructure - 339,070 SF
Design
$93,000,000 CJ est. value
Overland Park, KS 66223

Moonlight Sidewalk
Post-Bid
Gardner, KS

Mill Creek Trail Improvements 2021
Infrastructure
Post-Bid
Lenexa, KS

Road Construction, Moonlight Road
Results
KS

Road Construction, East of Mission Road
Results
KS

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Treadway Apartments
New Construction, Infrastructure - 505,500 SF
Construction
$200,000,000 CJ est. value
Gardner, KS 66030

Coca Cola Trailer Parking
New Construction
Pending Verification
Lenexa, KS

Pizza Hut / Olathe
New Construction, Infrastructure - 1,880 SF
Pending Verification
$570,000 CJ est. value
Olathe, KS 66062

Nall 58
New Construction, Infrastructure
Design
$30,000,000 est. value
Mission, KS 66202

2021 Street Maintenance Program
Infrastructure
Post-Bid
Edgerton, KS

2021 Cars 50th Street and Stateline Road
Results
$100,365 est. value
Westwood Hills, KS

Chick-Fil-A - Galleria 115 / Overland Park
New Construction, Infrastructure - 4,989 SF
Construction
$1,500,000 CJ est. value
Overland Park, KS 66211

Last Updated 09/07/2022 10:06 AM
Project Title

2021 Drainage Repair Program

Physical Address View project details and contacts
City, State (County) Prairie Village, KS 66208   (Johnson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $368,070 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes, but not limited to drainage inlets and pipe replacement, concrete curb and gutter, concrete sidewalk, and pavement patching. Direct all questions to Katie Stucky at kstucky@gbateam.com

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents