Similar Projects
MATOC IDIQ for Control Systems Installations at Hydroelectric Facilities for The U.S. Army Corps of Engineers, South Atlantic Division
Term Contract
Bidding
Less than $20,000,000 est. value

Electrical Connection Services of Retrofitted City Grinder Pump Systems for 991 Sites
Alteration
Bidding
Port Saint Lucie, FL

Purchase and Installation of Generator at Station 1
Post-Bid
Fort Pierce, FL 34950

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

Electrical Contractor Services
Results
Port Saint Lucie, FL 34986

Treasure Coast Diesel Generator Modification
Results
Fort Pierce, FL 34981

Switchgear
Post-Bid
Fort Pierce, FL 34950

Replacement of the Emergency Generator at Port St. Lucie City Hall
Results
Less than $750,000 est. value
Port Saint Lucie, FL 34984

Strobe/Led Lights: Flat and Pipe Mount
Term Contract
Post-Bid

Generator
Results
Port Saint Lucie, FL 34954

Specifications For Electrical Construction Repair To Damaged Utility Lines In Post Disaster Environment
Post-Bid
Moore Haven, FL

Fiberglass Crossarms
Term Contract
Results
$29,400 est. value
Fort Pierce, FL 34950

Hanger Fans
Term Contract
Post-Bid

Emergency Portable Generators
Term Contract
Results

NPS, Liebert UPS Semi Annual Maintenance
Term Contract
Post-Bid
Homestead, FL 33030

Last Updated 09/20/2021 04:00 AM
Project Title

Electrical Connection of Retrofitted City Grinder Pump Systems

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL   (Saint Lucie County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the existing residence, new individual branch circuit wiring shall be installed from the existing electrical distribution equipment (panel) to the control panel. For Grinder Systems the new individual branch circuit wiring shall be a twelve-three (12-3 with a ground wire) cable and (non-fused, 60A) Disconnect Box. Wiring will be a minimum size of #12AWG and shall be protected with a two-pole-20-amp over current device two hundred thirty (230) volt. For Low Pressure STEP Systems must provide one (1) twenty (20)-amp (minimum) breaker for use to supply power to the pump and one (1) fifteen (15)-amp (minimum) breaker for use to supply power for the control circuit. Pump power minimum wire size 12-gauge copper conductor (75-C). Control circuit minimum wire size 12-gauge copper conductor (75-C). The wire size is based on less than one hundred (100) feet. Acknowledges distance between electrical control box and STEP tank will not exceed twenty-five (25) feet. NOTE: As of April 1993, installation requires two (2) separate breakers on same phase in panel box. The exterior weather proof (non-Fused, 60 A) Disconnect Box with blank cover and wire shall be forty (40) inches above finished floor and located on the side of the home within five (5) feet of the front corner (same corner as sewer lateral). Height of panel shall be a minimum of three and a half (3 ½) feet or forty-two (42) inches and a maximum of four and a half (4 ½) feet or fifty-four (54) inches.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents