Similar Projects
John Downey Drive Roadway and Pedestrian Improvements - City of New Britain
Alteration
Conception
$3,000,000 est. value
New Britain, CT 06051

Riverfront Park, Walk and Bike Path - City of Hartford
Infrastructure
Conception
Less than $750,000 est. value
Hartford, CT 06103

Elms Village Sidewalk Replacement
Infrastructure
Bidding
$170,000 est. value
East Hartford, CT

Reconstruction of Wolcott Hill Road and Franklin Avenue
Infrastructure
Bidding
$2,700,000 est. value
Wethersfield, CT 06109

New Parking Lot at Gaylord Towers
Post-Bid
Bristol, CT 06010

Exterior Lighting Upgrade and Site Improvements at Elms Village Apartments
Alteration
Post-Bid
East Hartford, CT

Town Center Sidewalks - Jones Hollow Road, Cheney Road & North Main Street - Contract 1
Results
$175,000 to $225,000 est. value
Marlborough, CT

Pitkin Street Sidewalk Replacement Project
Results
East Hartford, CT 06108

Community Connectivity Grant Program - Old Wethersfield Safety Improvements
Infrastructure
Bidding
$220,000 est. value
Wethersfield, CT 06109

Sidewalk Reconstruction
Infrastructure
Post-Bid
Plainville, CT

2021 Permanent Street Curbing Installation
Results
West Hartford, CT

Sidewalk Connectivity
Infrastructure
Bidding
$80,000 est. value
Berlin, CT

On-Call Excavation Contractor Services
Term Contract
Post-Bid
East Windsor, CT

ADA Sidewalk Compliance Project Phase I
Results
Hartford, CT

Ridgewood St - Griswold St Area Improvements
Infrastructure
Bidding
$1,294,940 est. value
Manchester, CT 06040

Reported 07/11/2022 02:24 PM
Project Title

Hartford Public Safety Complex Parking - City of Hartford

Physical Address View project details and contacts
City, State (County) Hartford, CT   (Hartford County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $11,756,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a sidewalk / parking lot in Hartford, Connecticut. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot. The Hartford Public Safety Complex parking for employees vehicles, police vehicles and equipment has out grown the current space. It has been determined that a new parking structure to supplement the existing garage is not economically feasible, however using an existing parking lot nearby the HPSC would more beneficial at this time. Solution: After researching City owned parking areas within a mile of the HPSC, the parking lot at 50 Williams St which supports the PAL organization and Quirk Middle School would be an ideal location. The existing parking lot would require striping, lighting and security gates. The FY2023 Funds would be used to design and construct the improvements. This project is in included in the City's or County's FY 2023-2027 Capital Improvement Plan (CIP). As of July 08, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents