Similar Projects
Founders Pointe Apartments
New Construction, Infrastructure
Design
Franklin, IN 46131

Founders Pointe Apartments
New Construction, Infrastructure
Design
Franklin, IN 46131

Johnson County Courthouse Exterior Sitework Project
Infrastructure
Bidding
$250,000 CJ est. value
Franklin, IN 46131

Wellness Center - Center Grove Community School Corporation - General Trades / Site work (BP#01)
New Construction, Infrastructure
Bidding
$3,000,000 CJ est. value
Greenwood, IN 46143

Wellness Center - Center Grove Community School Corporation - Structural Steel (BP#02)
New Construction, Infrastructure
Sub-Bidding
$2,500,000 CJ est. value
Greenwood, IN 46143

2021 CCMG - Full Depth Reconstruction and Mill and Overlay
Infrastructure
Post-Bid
Greenwood, IN

2021 CCMG - Thin Overlay
Infrastructure
Post-Bid
Greenwood, IN

Paving
Infrastructure
Results
Whiteland, IN 46184

Road Reconstruction
Infrastructure
Results
$4,389,769 est. value
IN

Newkirk Square Mixed-Use Development
New Construction - 11,300 SF
Construction
$11,000,000 est. value
Franklin, IN 46131

The Madison Mixed-Use Development
New Construction - 54,000 SF
Construction
$83,000,000 est. value
Greenwood, IN

Lincoln Place Subdivision
New Construction
Pending Verification
$500,000 to $1,000,000 CJ est. value
Greenwood, IN 46143

Patriot Defense Research Park - Buildings 1 & 2
New Construction, Infrastructure - 106,400 SF
Pending Verification
$57,000,000 CJ est. value
Franklin, IN 46131

Sagebriar Planned Unit Development
New Construction, Infrastructure
Design
$200,000,000 CJ est. value
Greenwood, IN 46143

Graham Road Extension
Infrastructure
Bidding
$300,000 CJ est. value
Franklin, IN 46131

Last Updated 05/09/2023 04:21 PM
Project Title

The Pattern at Greenwood

Physical Address View project details and contacts
City, State (County) Greenwood, IN 46142   (Johnson County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $75,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a residential community. There will be 17 apartment buildings for a total of 578 units, two swimming pools, dog park, walking trails and a clubhouse. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents