Similar Projects
Last Updated | 08/18/2022 08:32 PM |
Project Title | Chiller Replacement - David Wade Correctional Center |
Physical Address | View project details and contacts |
City, State (County) | Homer, LA 71040 (Claiborne County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $200,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor to furnish all labor materials, tools, crane, and services required to remove existing defective chillers and replace with two (2) Trane CGAM070F2-2AXB2A1A1A1AX-A1CAXXX (or equal) seventy (70) ton chillers -Contractor shall remove defective chillers and existing insulated piping. David Wade Correctional Center will maintain possession of removed chillers. Defective chillers shall be removed and relocated outside perimeter fence. Chillers to be removed are Trane model # RTAA0704XT01A300BF and #RTAA0704XT01A3C0B. -Contractor shall deliver and install two (2) new seventy (70) ton chillers on existing stands. New chillers to be installed shall be: Trane CGAM070F2-2AXB2A1A1A1AXA1CAXXX (or equal). -Contractor shall supply and install new pipes. -Contractor shall supply and insulate new piping and properly dispose of old insulation. -New chillers shall include hail guards, feet, and low ambient controls supplied and installed by contractor. -David Wade Correctional Center will have in place, new disconnects for the contractor to tie electrical into new chillers. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |