Similar Projects
Wilson Focus Elementary Roof Top Unit Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Omaha, NE 68117

Westside High School West Campus AHU Replacement - Phase I
Alteration
Post-Bid
Omaha, NE 68144

Air Filters for Facilities Management (City) and Public Properties (County)
Alteration
Post-Bid
NE

Rohwer Elementary School Heat Pump Replacement
Alteration
Results
Omaha, NE

Andersen Middle School Heat Pump Replacement - Phase I
Alteration
Results
Omaha, NE 68137

Jones Street Station Units 1 and 2 Exhaust Stacks Replacement
Alteration
Post-Bid
Omaha, NE 68105

Morton Elementary School Multizone Rooftop Unit Replacement
Alteration
Results
Omaha, NE 68130

Westside High School Water Source Heat Pump Replacement Phase III
Alteration
Post-Bid
Omaha, NE 68114

UNO Maverick Village Water Heater Replacement Project
Renovation, Alteration
Results
Omaha, NE 68182

McMillan MS Closed Circuit Cooling Tower Addition
Infrastructure
Post-Bid
$900,000 est. value
Omaha, NE 68112

Abrahams Library Air Handler Replacement
Alteration
Results
Omaha, NE 68134

Chiller Installation
Renovation
Post-Bid
$60,000 CJ est. value
Omaha, NE 68108

Construction Manager at Risk - UNMC MSB Air Handling Unit Replacements
Alteration
Results
$7,000,000 est. value
Omaha, NE 68105

South High School Chiller Replacement
Renovation
Post-Bid
$300,000 CJ est. value
Omaha, NE 68137

NO4 Air Preheater Baskets and Seals
Renovation
Results
$572,954 CJ est. value
Omaha, NE 68102

Last Updated 01/04/2023 10:33 AM
Project Title

Rose Hill Elementary School and Belvedere Elementary School Cooling Tower Additions

Physical Address View project details and contacts
City, State (County) Omaha, NE 68102   (Douglas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work called for in these Bid Documents includes the removal and disposal of existing boilers, pumps, capping the existence lines going to geothermal loop in both of these facilities. Also, adding heat exchangers, cooling towers, holding water tank and one boiler to each facility. Bids are to be completed on the bid form contained in the Bid Documents. A copy of the bid with original signatures by the bidder, including all required information, attachments and exhibits, including an original bid bond asrequired in Section 1.2, are to be submitted to the District in accordance with the requirements of the Bid Documents. An original certified check or cashiers check payable to the Board of Education or satisfactory original Bid Bond executed by the bidder and acceptable sureties in an amount equal to five percent (5%) of the amount of the bid shall be submitted with each bid. If an original cashiers or certified check or an original signed Bid Bond as required by this Section is not received by the District by the bid submission deadline, the bid will not be considered. The Bid Bond, cashiers check or certified check will be retained as liquidated damages in case the bidder awarded the Contract fails to furnish the required performance and payment bond, insurance certificate, or sign the Contract within ten (10) days after notification of award. Any questions or request for interpretation of these Bid Documents should be emailed to: Questions_Clarifications_1@ops.org

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents