Similar Projects
Cole Grade Road - San Diego County
Alteration
Conception
$29,200,000 est. value
Valley Center, CA 92082

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Roadway Rehab to Mitigate Highway Settlement, Construct Aux Lane
Infrastructure
Design
$44,537,000 est. value
San Diego, CA 92124

FY21-22 Pavement Rehabilitation Overlay and Slurry Seal Project
Term Contract
Bidding
$1,025,000 est. value
Encinitas, CA

MLK Recreation Center Moisture Intrusion
Infrastructure, Alteration
Bidding
$916,000 est. value
San Diego, CA 92114

Parking Lot Seal And Stripe Services
Infrastructure
Post-Bid
$65,000 est. value
San Diego, CA 92117

Street Preventive Maintenance
Alteration
Post-Bid
$420,000 est. value
Coronado, CA

Slurry Seal Services
Infrastructure
Results
Vista, CA 92081

ADP Airside Improvements
New Construction, Renovation, Infrastructure, Alteration
Results
$270,000,000 est. value
San Diego, CA

Helix 9 Flow Control Facility
New Construction, Infrastructure
Design
$6,000,000 to $8,000,000 est. value
San Diego, CA

Slurry Seal Group 2222
Infrastructure
Bidding
$5,100,000 est. value
San Diego, CA

Minor B - Sb - Install Mgs
Infrastructure
Post-Bid
CA

Pershing Drive Bikeway Project
Infrastructure
Results
$12,980,675 est. value
San Diego, CA 92101

Butterfly Valves for Ramona Pipeline Valve Replacement - 5886410
Infrastructure
Design
$800,000 est. value
San Diego, CA 92101

FY21-22 Pavement Rehabilitation Overlay and Slurry Seal Project
Infrastructure
Bidding
$1,300,000 est. value
Encinitas, CA

Reported 07/14/2022 07:50 AM
Project Title

Leucadia Streetscape B and C Safety And Mobility - City of Encinitas

Physical Address View project details and contacts
City, State (County) Encinitas, CA 92024   (San Diego County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of the project or A detailed scope has not yet been determined Leucadia Streetscape B and C Safety And Mobility This project is in included in the City of Encinitas FY 2022-2027 Capital Improvement Plan (CIP). As of July 13, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents