Similar Projects
Runway Safety Area Improvements project
Post-Bid
Jonesboro, AR 72401

Rehabilitation Runway 13-31
Post-Bid
Clinton, AR

Wide Asphalt Access Road at McGehee Municipal Airport
Results
McGehee, AR

Runway 13-31 Rehabilitation
Results
Less than $103,250 est. value
El Dorado, AR

Rehabilitate Apron Areas
Post-Bid
Berryville, AR

Runway 17-35 Complex Asphalt Pavement Rehabilitation
Results
Less than $320,000 est. value
Bentonville, AR

Runway 18-36 Overlay Project
Post-Bid
Magnolia, AR 71753

Terminal Ramp Rehabilitation
Results
Less than $172,785 est. value
Heber Springs, AR 72543

H35 Apron Rehabilitation
Infrastructure
Post-Bid
$400,000 est. value
Clarksville, AR

FYV Runway Pavement and Lighting Rehabilitation
Infrastructure
Results
Less than $7,500,000 est. value
Fayetteville, AR 72701

Runway 13-31 Rehabilitation
Infrastructure
Post-Bid
$220,000 to $275,000 est. value
Hot Springs, AR

Crack Sealing on Taxiway and Apron
Infrastructure
Results
Searcy, AR 72143

Taxiway Safety Area Improvements Phase I
Infrastructure
Post-Bid
Bryant, AR

Runway 17-35 Rehabilitation
Infrastructure
Results
$115,000 to $145,000 est. value
North Little Rock, AR

Crack Sealing on Taxiways at the Frank Federer Memorial Airport
Infrastructure
Post-Bid
Brinkley, AR

Last Updated 01/13/2022 04:35 PM
Project Title

ASG Taxiway B Extension

Physical Address View project details and contacts
City, State (County) Springdale, AR   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,765,255
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the construction of approximately 1700 tons of asphalt pavement, and associated base and subbase courses, extension of a quadruple 10’ x 7’ box culvert approximately 140 feet, Approximately 4,500 LF of taxiway lighting improvements, and associated electrical improvements as shown in the plans and specifications.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents