Similar Projects
Tyndall Park Gene Moss Parking
Infrastructure
Bidding
Benton, AR

Slaughter Pen Emergency Access Route
Infrastructure
Bidding
Bentonville, AR

Shannon Hills Safe Routes to School - Sidewalks
Post-Bid
Alexander, Shannon Hills, AR 72002

EACC Truck Driving Range
Infrastructure
Post-Bid
$125,000 est. value
Forrest City, AR 72335

Magnolia High School Drive Sidewalk
Results
Less than $127,000 est. value
Magnolia, AR 71753

New Walking / Biking Trail on the Campus of ASU-MTN
Results
Mountain Home, AR

Slaughter Pen West Parking
Renovation, Infrastructure
Pending Verification
Bentonville, AR 72712

Clinton Sidewalk Improvements
Infrastructure
Bidding
Clinton, AR

Rockport Walking Trail
Infrastructure
Post-Bid
Rockport, AR

I-40 Truck Parking Expansion Project (West Memphis)
Results
AR

Natural Surface Trail Services
Infrastructure
Post-Bid
Rogers, AR

2021 Paving Program, Paving of Miscellaneous Street, Trails and Parking Lots
Results
Less than $1,000,000 est. value
Searcy, AR

Pavement Rehabilitation for North Heights School Parking Lot
Infrastructure
Post-Bid
$230,000 est. value
Texarkana, AR

Bryant Parkway Trail
Results
Bryant, AR

Construction for ASU Loop Trail Phase 2
Infrastructure
Post-Bid
Jonesboro, AR

Reported 09/21/2021 12:00 AM
Project Title

2019 Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Bentonville, AR 72712   (Benton County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of: Construction of concrete sidewalks, accessible ramps, retaining walls, handrails, concrete curb gutter, drainage structures, storm drains, removal and disposal of existing concrete improvements, disposal of trees and shrubs, associated grading, erosion control, revegetation and miscellaneous improvements adjacent to NE Cub Circle between NE Tiger Boulevard and NE "A" Street.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents