Similar Projects
Construction of Bonaventure Fire Rescue Station No. 21
New Construction - 12,578 SF
Construction
Less than $5,250,000 est. value
Weston, FL 33326

CM@Risk Services for New Police Station
New Construction - 196,000 SF
Results
Less than $100,000,000 est. value
Fort Lauderdale, FL 33312

Fire Station 64 Replacement at Kiwanis Park
Renovation
Design
Coral Springs, FL 33071

Fire Rescue Station 30 Construction
New Construction - 9,554 SF
Results
Less than $3,500,000 est. value
Lauderhill, FL 33313

Consultant Services for a New Police Headquarters
New Construction - 225,000 SF
Results
Fort Lauderdale, FL 33301

Lauderhill Police Department Expansion Phase 2
New Construction - 13,696 SF
Results
Lauderhill, FL 33313

Cubesmart and Fire Station
New Construction, Build-Out - 97,367 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Oakland Park, FL 33334

Fire Station No. 4 Training Tower Stucco
Results
Plantation, FL 33324

Construction Manager at Risk for New Police Headquarters
New Construction - 120,000 SF
Results
Less than $45,000,000 est. value
Hollywood, FL 33021

Fire Station No. 2 Apparatus Bays Renovation
Renovation
Results
Less than $400,000 est. value
Plantation, FL 33317

Fire Station 114
New Construction - 13,990 SF
Post-Bid
$6,200,500 est. value
Pompano Beach, FL 33069

Fire Department - 2nd Floor Build Out/Fusion Center (Hollywood)
Build-Out
Bidding
Hollywood, FL 33021

Construction Management Services Continuing Contracts
Term Contract
Post-Bid
Hollywood, FL 33022

Margate Fire Station No. 58 Demolition and New Construction
New Construction, Demolition
Results
Margate, FL 33063

Coral Springs Police Memorial
Results
Coral Springs, FL 33065

Last Updated 02/14/2020 08:36 AM
Project Title

Design Build Lauderhill Police Department Expansion Phase 1

Physical Address View project details and contacts
City, State (County) Lauderhill, FL 33313   (Broward County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Design Build Team shall provide Design/ Build Team services to include all labor, material, equipment and incidentals for the design and construct a new 2 story building plus Mezzanine Building on the East side of the existing police department facility. The area of the building will be 13,696.00 SF

Details

Fire/Police Station, Approximately 13,696 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents