Similar Projects
Purchase and Development of Lauderdale County Property
New Construction
Post-Bid
Meridian, MS 39304

The Rejuvenation Station- Health & Wellness Spa
New Construction, Demolition
Conception
Biloxi, MS

Beau Rivage Resort and Casino
Renovation
Design
Biloxi, MS 39530

Aqua Suites Biloxi Boutique Hotel
New Construction
Design
$32,000,000 est. value
Biloxi, MS 39530

Residence Inn by Marriott
New Construction
Design
Biloxi, MS 39530

Landers Center Expansion
Addition, Demolition, Renovation, Infrastructure - 175,000 SF
Design
$35,000,000 CJ est. value
Southaven, MS 38671

Blue Water Beach
New Construction
Design
$410,000,000 est. value
D'Iberville, MS

StayAPT Suites / Flowood
New Construction, Infrastructure - 45,765 SF
Post-Bid
$11,000,000 CJ est. value
Flowood, MS 39232

Flamingo Beach Inn & Comfort Inn/Choice Hotels Redevelopment
New Construction, Renovation, Infrastructure
Design
$15,000,000 CJ est. value
Biloxi, MS 39531

Rock & Brews Casino
Addition, New Construction, Infrastructure - 40,000 SF
Pending Verification
$200,000,000 CJ est. value
Biloxi, MS 39530

The Village at Livingston - Phase 2
New Construction, Infrastructure
Conception
$15,000,000 CJ est. value
Jackson, MS 39201

Lake Okhissa Hotel and Conference Center Development
New Construction, Infrastructure
Pending Verification
$50,000,000 CJ est. value
Meadville, MS 39653

Home 2 Suites by Hilton
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Biloxi, MS 39530

Last Updated 10/31/2022 01:33 PM
Project Title

Holiday Inn / Biloxi

Physical Address View project details and contacts
City, State (County) Biloxi, MS 39531   (Harrison County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method Bids by Invitation
Project Status
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Further scope has not been released. As of April 17, 2018, this project is in the early planning stages, and waiting to receive site plan approval from the Biloxi Planning Commission. The owner will be acting as the general contractor. A firm timeline has not been established, however, construction is not expected to begin prior to fall 2018.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade, Remodeling, Remodeling.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents