Similar Projects
2022 Bid for Licensed HVAC/Plumbing Services
Alteration
Bidding
Ardsley, Hartsdale, White Plains, NY 10607

General Plumbing Services/Repair and Backflow Testing Repair
Alteration
Bidding
Port Washington, NY

Plumbing Contract Services
Term Contract
Post-Bid
Tarrytown, NY 10591

PVC Pipe and Fittings
Term Contract
Post-Bid
Syracuse, NY 13202

Various Mechanical and Plumbing Term Services
Term Contract
Results
Canandaigua, NY 14424

Countywide Water Fountain and Bathroom Fixture Replacement
Results
Buffalo, NY 14202

Contract for Repair of Plumbing Systems
Alteration
Bidding
Brooklyn, NY

Provision Emergency Rental Repair Services - Plumbing
Term Contract
Post-Bid
Albany, NY 12207

Fernco PVC Pipe Fittings
Term Contract
Results
Rochester, NY 14614

Contracts for Site Work, General Construction, Plumbing, HVAC, Electrical
Term Contract
Bidding
East Northport, NY

Piping and Pipe Fittings
Post-Bid
Rochester, NY

Cooperative Electrical, Plumbing and Building Supplies
Term Contract
Results

General Construction, Plumbing Construction , HVAC Work, and Electrical Construction Work
Renovation, Alteration
Bidding
Bellmore, NY

General, Electrical, Plumbing, Building and Yard Emergency Services At LNA In NY, NJ & PA
Renovation
Post-Bid
Albany, NY

Cooperative Plumbing Repair, Maintenance and Installation Service
Term Contract
Results

Last Updated 03/08/2022 12:52 PM
Project Title

Milton Street WWTP Solids Building Hot Water Piping Replacement Project

Physical Address View project details and contacts
City, State (County) Elmira, NY 14904   (Chemung County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of the Project is defined by the Contract Documents and includes but is not limited to: 1. Remove and replace sections of existing HVAC hot water piping that carries hot water to and from the boiler system to various heating units located throughout the solids building of the Milton St WWTP. 2. Piping to be replaced includes a combination of iron and copper piping ranging in size from 1-inch to 4-inches in diameter. 3. New hot water piping and associated appurtenances shall match the existing configuration in terms of pipe diameter, approximate location of fittings, utilization of wall penetrations, and location and orientation of valves and sensors. Valves shall be replaced as specified. Existing sensors, instrumentation, and other appurtenances shall be reconnected to the new piping as detailed. 4. Reuse of the existing pipe hangers is expected unless otherwise indicated. 5. New piping and appurtenances shall be painted, insulated and labeled to match the current configuration. 6. Testing and balancing of newly installed piping as specified. 7. Phasing and staging shall be implemented to minimize operational disruption during construction to the extent possible.

Details

Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents