Similar Projects
Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

Page Hall Renovation
Renovation, Alteration - 31,000 SF
Design
Raleigh, NC 27695

3145 South Tryon Street Chiller Replacement Project
Alteration
Bidding
$450,000 to $500,000 est. value
Charlotte, NC 28217

Scott Hall HVAC Upgrades - Phase II
Term Contract
Bidding
$763,000 est. value
Raleigh, NC 27607

US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

PC Air Units
Post-Bid
Charlotte, NC 28208

HVAC Repairs Rachel Freeman School of Engineering
Results
Less than $93,657 est. value
Wilmington, NC 28405

Appalachian State University Varsity Gym HVAC Upgrades
Results
Boone, NC

Fire Station 5 Hvac Renovation
Alteration
Bidding
Mooresville, NC

Removal and Replacement of HVAC Systems-Multiple Locations
Post-Bid
Wilmington, NC 28402

Cooling Tower Replacement Smith High School Project
Results
Greensboro, NC 27406

Construction of NCA and T Fort IRC 25-Ton Chiller Replacement
New Construction, Alteration
Bidding
Greensboro, NC

Century Station Air Cooled Chiller Replacement
Post-Bid
$25,000 to $100,000 est. value
Raleigh, NC 27601

Piney Grove Elementary School HVAC Replacement
Results
Kernersville, NC 27284

HVAC Air Filter Preventative Maintenance Service
Alteration
Bidding
Charlotte, NC

Reported 09/17/2021 11:22 AM
Project Title

Unc School Of The Arts Residence Hall HVAC Phase 2

Physical Address View project details and contacts
City, State (County) Winston-Salem, NC   (Forsyth County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method
Project Status Construction Nearing Completion, Construction Completion Expected November 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

5 Story + 4 Story wings with connecting bridge, approximately 120,000 sqft. of student and staff living quarters, 458 beds and 2 staff apartments, project will be constructed in 2 phases. Phase 2- HVAC will include HVAC only.

Details

College/University, 120,000 SF New Construction.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents