Similar Projects
Central Gwinnett High School - Interior Renovations - Communications [Division 27]
Renovation
Bidding
$300,000 CJ est. value
Lawrenceville, GA 30046

Annual Concrete Pipe
Term Contract
Post-Bid
GA

Procurement of Canine Kennels Concrete Slabs
Alteration
Post-Bid
Less than $200,000 est. value
Covington, Hampton, Stockbridge, Temple, Villa Rica, GA 30180

Replace Concrete Driveway Pad at Forsyth Fire Station
Results
Forsyth, GA 31029

Concrete Work
Term Contract
Results
Less than $250,000 est. value
Smyrna, GA

Canopy and Concrete Demolition and Replacement at Fire Station 51
Alteration
Post-Bid
Marietta, GA

Concrete as-Needed Basis for Roads and Bridges
Alteration
Results
Cumming, GA

Landfill Scale Replacement
Infrastructure
Post-Bid
Rome, GA

JP Moseley Park Concrete Demo and Replacement
Alteration
Results
Stockbridge, GA 30281

Purchase of Embedded Cylinder Pip
Alteration
Post-Bid
GA

Concrete Pads and Sidewalks for Marta Shelters
Infrastructure
Results
Tucker, GA

Pour Concrete Between Two Large Existing Concrete Slabs
Alteration
Post-Bid
GA

Concrete Work at Gum Springs Park
Alteration
Results
GA

Concrete for Facilities Management Division
Alteration
Post-Bid
Athens, GA

Ready-Mix Concrete Annual Contract
Term Contract
Results
GA

Last Updated 12/12/2022 12:04 PM
Project Title

CIP LMIG Resurfacing

Physical Address View project details and contacts
City, State (County) Sandy Springs, GA 30328   (Fulton County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $6,135,304 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

CIP LMIG Resurfacing QUESTIONS DUE September 30, 2022 5:00 P.M. All communications regarding this solicitation must be with the assigned Procurement Agent, Edward S McAdoo III, purchasing@sandyspringsga.gov Questions received after this date and time may not be answered. The contractor shall furnish all materials, equipment, and labor to complete the required construction as described in its entirety to the specifications as directed and the terms of this contract including all incidentals as directed by the City of Sandy Springs Director of Public Works or a representative. Unless otherwise specified, all work shall be completed in accordance with Georgia Department of Transportation Standard Specifications (current edition). The contractor shall be Pre-qualified Prime Contractor listed by the Georgia Department of Transportation and must perform at least 51% of the work. o The work shall consist of milling to a minimum depth of one and one half (1.5) inches, patching as required, and paving with 12.5mm at 165 lbs./SY or as directed by the engineer/COSS representative. o Temporary striping where required shall follow within twenty-four (24) hours of resurfacing. o Permanent traffic striping shall take place no later than fourteen (14) days after resurfacing. o Roads shall not remain milled for a period of more than seven (7) days. o Working hours are expected to be Monday to Friday, 8 AM to 5 PM, with the exception of all Collector, Arterial, and Minor Arterial streets work hours being Monday to Friday, 9AM to 3PM.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents