Similar Projects
Luxury Apartment Tower
New Construction - 275,000 SF
Conception
$10,000,000 CJ est. value
Indianapolis, IN 46204

Monon 30 Mixed-Use Development
New Construction - 25,000 SF
Conception
$100,000,000 est. value
Indianapolis, IN 46213

Fountain Square Ten Townhomes
New Construction - 8,650 SF
Design
$12,500,000 est. value
Indianapolis, IN 46203

AutoZone #5765 / Indianapolis
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Indianapolis, IN 46217

Traffic Signals Modernization, Bridge Maintenance and Repair
Infrastructure
Bidding
$1,089,259 CJ est. value
Indianapolis, IN 46218

Traffic Signals Modernization, Bridge Maintenance and Repair
Infrastructure
Bidding
$1,089,259 CJ est. value
Indianapolis, IN 46218

Monon 46 Mixed Use Development
New Construction - 281,900 SF
Post-Bid
$16,000,000 est. value
Indianapolis, IN 46205

Asphalt Paving and Site Improvements
Post-Bid
Indianapolis, IN 46214

2021 Road Resurfacing
Infrastructure
Results
Lawrence, IN

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Indianapolis Academic Health Center Medical Education and Research Facility
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Indianapolis, IN 46202

Rise on Meridian Apartment Building
New Construction, Demolition - 300,000 SF
Construction
$10,000,000 CJ est. value
Indianapolis, IN 46225

Townes at Kennedy-King
New Construction - 9,100 SF
Pending Verification
$10,000,000 est. value
Indianapolis, IN 46202

Colere'
New Construction, Demolition - 27,246 SF
Pending Verification
$12,500,000 est. value
Indianapolis, IN 46201

Rural Street Underpass Clearance (Construction) - IndyGo - Indianapolis Public Transportation
Infrastructure
Conception
$6,571,000 CJ est. value
Indianapolis, IN 46218

Last Updated 02/17/2023 08:38 AM
Project Title

82nd Street / Clearwater Development

Physical Address View project details and contacts
City, State (County) Indianapolis, IN 46250   (Marion County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Paving/Reconstruction, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $115,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a new apartment complex. The amenities will be a pool and green space. As of February 17, 2023, this project is in the early construction documents phase. It went before the Metropolitan Development Commission of Marion County on January 26, 2023 for rezoning. An architect has been selected, however, information regarding the selection of a general contractor has not yet been determined. A firm timeline has not been announced, however, construction is unlikely to begin prior to second quarter of 2023.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents