Similar Projects
Last Updated | 06/30/2023 10:36 AM |
Project Title | Perpetuation - Resurfacing - STH 29 from 320th St. to Koser Ave (EB & WB) |
Physical Address | View project details and contacts |
City, State (County) | Chippewa Falls, WI 54729 (Chippewa County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2024 |
Bids Due | View project details and contacts |
Estimated Value | $12,000,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of June 30, 2023, an engineer has been awarded and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Perpetuation project to resurface 7.044 miles of STH 29 from 320th St. to Koser Ave (EB & WB), Towns of Delmer, and Thorp and City of Stanley, Chippewa County. Work consists of concrete pavement repairs and hot-mixed asphalt. Additional work includes culverts, ditch cleaning, roadside clearing, riprap, wingwall replacements on B-09-0029, concrete surface repair, beam guard replacements, curb and gutter, gravel shouldering, pavement markings, and restoration. Proposed to be constructed under traffic using single lane closures with temporary speed limit reduction Anticipated Construction Cost: $11,000,000-$11,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - RFP Engineering - Perpetuation - Resurfacing *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||
Details |
|
||||||||||
Bidder's List | View project details and contacts | ||||||||||
Prospective Bidders | View project details and contacts | ||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |