Similar Projects
Last Updated | 10/06/2022 11:48 AM |
Project Title | FY22-23 Sewer Rehabilitation |
Physical Address | View project details and contacts |
City, State (County) | Bowling Green, KY 42101 (Warren County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected November 2022 |
Bids Due | View project details and contacts |
Estimated Value | $300,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Water/Wastewater Division of Bowling Green Municipal Utilities request sealed Bids for the Cured in Place Rehabilitation of 1200 LF of existing 42" sanitary sewer pipe.This involves bypass pumping, manhole repair, manhole rehab, service connection, and casting replacement. Any bid received at the designated location after the required time and date specified for receipt shall be considered late and non-responsive and will not be evaluated for award. Faxed or emailed responses will not be evaluated for award. Please mark bid envelope FY22-23 SEWER REHABILITATION prior to the date and time listed above. To ensure against premature opening. The envelope should bear on the outside the name of the bidder and their address. Bowling Green Municipal Utilities reserves the right to reject any and/or all bids or to accept the lowest bid or lowest evaluated bid. All bids shall be evaluated on the following criteria: Cost, Qualifications/Experience, Past Record with BGMU, References, Timeliness, Compliance with Bid Specifications, Quality of Materials, Financial Stability, and Compliance with Law. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |