Similar Projects
Turf, Landscape and Litter Maintenance Services
Bidding
Huntsville, AL 35824

Bridge Street Town Centre Invites Landscape Service
Term Contract
Post-Bid
Huntsville, AL

Lawn Care Service for the Entire Complex of Crestview Manor
Post-Bid
Evergreen, AL 36401

W Dothan and Flynn Road Substations Vegetation Management Services (Tree Trimming)
Results
Dothan, AL

Athletic Fields Maintenance and Lawn Maintenance of the President's Residence
Results
Montgomery, AL

Lawn Maintenance Services
Post-Bid
Auburn, AL

Stanley Jensen Stadium Turf Replacement Project
Results
Less than $403,506 est. value
Prattville, AL

Landscaping Restoration
Post-Bid
Birmingham, AL

Maintenance of Lawns
Results
AL

2018/2019 Annual Contract for Right of Way Clearing
Term Contract
Post-Bid
Daphne, AL

Ground Maintenance - Cemeteries
Term Contract
Results
Tuscaloosa, AL

Fertilizer - Wiregrass Extension and Research Center
Post-Bid
Headland, AL 36345

Ground Maintenance - Various City Locations
Term Contract
Results
Tuscaloosa, AL

Mulch
Post-Bid
Gulf Shores, AL

Annual Contract for Line Clearance
Term Contract
Results
Sylacauga, AL

Last Updated 03/20/2019 02:57 PM
Project Title

S--New Contract (FY2019) Turf Management Services for SDVOSBs Fort Mitchell National Cemetery

Physical Address View project details and contacts
City, State (County) Fort Mitchell, AL 36856   (Russell County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Lawn Maintenance: Fertilizing, Herbicides and Other Pest Control: (a) Inspection to determine type of weed control management that is required and that is appropriate. (b) Herbicide control shall include, but it is not limited to the following weeds: Dandelion, Chickweed, Knotweed, Purslane, Plantain, Clover, Ground Ivy, Violets, Onions, Crabgrass and any other Broadleaf, Stubborn, or Grassy weeds found during inspections. (c) Contractor to perform evaluation of weed control measures through follow-up inspections. Actively growing weeds present two weeks post application will be retreated at contractor' expense. The contractor will respond with a corrective action plan within 3 days of notification by the Contracting Officer's Representative (COR) of any unsatisfactory results from weed control application. Unless precluded by inclement weather, the corrective action plan will be completed within 7 days following plan submission. (d) Chemicals used for this contract shall be safe for use around cemetery employees and the general public as well as labeled for Alabama. (e) The contractor shall be responsible for taking all precautions to prevent damage to the cemetery in any manner, including headstones, markers, monuments, flower beds, trees and other structures during application operations. (f) Fertilizer: shall be applied based on the results and recommendations of a soil test for each section. The soil test will be conducted by Cemetery Personnel with copies going to the Contractor. A complete fertilizer will be applied 4 times each year (as ordered), unless local practice indicates a more favorable time. Only 40% slow release shall be used. (g) Lime: When soil tests indicate a need for lime, it shall be applied at the rate indicated in those tests. Time of application shall be in late fall or early winter, unless local practice indicates more favorable time. (h) Weed and Insect Control: All weed growth and insect shall be controlled by means of spray/granular broadcast or any other method approved by the Director/COR. All personnel using such sprays shall be properly trained and the person in charge shall be duly licensed by the State of Alabama to use pesticides. Treatment for weeds will be accomplished to maximize herbicide effectiveness. (i) Control of Fire Ants and other Pest: Contractor shall apply necessary chemical applications to control fire ants and/or other pest. (j) Control of Crabgrass: The entire established turf areas will be treated with sufficient amount of pre-emergence to prevent germination of crabgrass. (k) Contractor will notify the Director, Fort Mitchell National Cemetery, 48 hours prior to any of the above applications. This is to ensure that coordination can be made so that the treatments do not conflict with any interment or cemetery maintenance activity.
Details
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting Preparation, Soil Preparation, Landscape Grading.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents