Similar Projects
Precast Concrete Headwalls
Bidding

Fabric Concrete Bag Reventment
Results

Box Culverts
Results

Concrete Pipes
Results

Culvert Replacement - SR 2-03.03 L and R
Results
Eastlake, OH

Maplewood Basin Improvements
Results
Less than $457,369 est. value
Painesville, OH

Carter Road Arch Culvert Repair
Results
$170,000 to $187,000 est. value
Painesville, OH

Dodd Road Embankment Protection
Results
Less than $361,778 est. value
Willoughby Hills, OH 44092

2019 Drainage Improvement Projects
Results
Less than $600,000 est. value
Kirtland, OH

Slide Repair - IR275-2.62 (55.70)
Results

Miami Road Drainage Improvements
Results
Less than $684,000 est. value
Mentor on the Lake, OH 44060

Streambank Stabilization Project
Results
Painesville, OH 44077

Chillicothe Road Widening and Drainage Improvements
Results
Less than $275,000 est. value
Kirtland Hills, OH 44060

Winchell Road Culvert Replacement
Results
$100,800 to $123,200 est. value
Painesville, OH 44077

Culvert Invert Paving
Term Contract
Results

Last Updated 02/26/2019 08:08 AM
Project Title

Design/Build Services for the East Branch Chagrin River Streambank Stabilization Project

Physical Address View project details and contacts
City, State (County) Kirtland, OH   (Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents