Similar Projects
Countywide Demolition
Demolition, Infrastructure
Sub-Bidding
$70,000 CJ est. value
Beaver, PA 15009

211 and 213 Main Street Demolition Project
Demolition, Infrastructure
Sub-Bidding
$112,600 CJ est. value
Greenville, PA 16125

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Remedial Investigations for Per- and Polyfluoroalkyl Substances (PFAS) Impacted Areas at Army Installations in the Northeast Region
Results

Asbestos Removal McDowell High School
Term Contract, Infrastructure
Sub-Bidding
$46,979 CJ est. value
Erie, PA 16506

Environmental Abatement and Disposal of Asbestos and Hazardous Materials
Alteration
Post-Bid
Ashland, PA

Asbestos Abatement, Demolition and Site Clearance
Infrastructure, Alteration
Results
Greensburg, PA

New Tailpipe Exhaust System Germantown Bus Depot
Renovation
Sub-Bidding
$169,580 CJ est. value
Philadelphia, PA 19102

Environmental Remediation Services
Term Contract
Post-Bid

Asbestos Abatement and Related Work
Alteration
Results
Pottstown, PA

Furnish and Install Emergency One-Touch Lockdown System
Renovation
Sub-Bidding
$1,100,000 CJ est. value
Pittsburgh, PA 15212

Soil Disposal At 29 LNA Sites
Term Contract, Alteration
Post-Bid

Asbestos Abatement of the Former Lincoln-Garfield Elementary School
Alteration
Results
New Castle, PA 16101

Last Updated 03/07/2023 01:34 PM
Project Title

Demolition 1150 S Garner Street

Physical Address View project details and contacts
City, State (County) State College, PA 16801   (Centre County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Borough of State College will be accepting bids for the following project: Project# CLT78 - DEMOLITION Work 1150 South Garner Street, State College, PA Work to start: By Monday, April 3, 2023 * Completion of Work: By Friday, June 2, 2023 * Access to property: Any time, by arrangement after the pre-bid walkthrough All buildings and out-buildings shall be completely razed. Concrete pads shall be removed, except for existing sidewalks along South Garner Street, which shall remain in place in their present conditions. a. Razing includes, but is not limited to, all items located on the property such as posts, piers, walls (including basement and foundation walls) garages, sheds, steps, thresholds, walkways, and concrete pads, except such items as specified to remain in place. 2. No method of demolition may be used unless all phases of such demolition are strictly confined to the limits of the demolition area and do not constitute a hazard to adjacent properties or to the public. 3. Damage done to adjacent buildings or property, including public and private roads and other public improvements shall be repaired or restored to original condition by the contractor and at the contractor's expense. Repairs or restoration must be made to the satisfaction of the appropriate property owner, State College Community Land Trust, and State College Borough. 4. State College Community Land Trust does not assume responsibility for the condition of the various buildings or loss of fixtures, equipment, material, or other objects between submittal of the proposal and start of demolition by the contractor. 5. Remove and dispose of material taken from within the project limits as well as debris and rubbish, immediately as it is generated. Clear materials from the site daily as they are prepared for disposal. 6. The Contractor shall also make all necessary arrangements with the various utilities encountered. Any damage to utilities shall be corrected by the Contractor at his expense and to the satisfaction of all parties concerned. 1. Removal of Surface Materials: Remove all existing fences, yard sidewalks, garages, garage floors, sheds, and all other at-grade slabs, steps, pavements or retaining walls, EXCEPT FOR THE SIDEWALK AND CURBING ALONG SOUTH GARNER STREET. All nonvegetative materials shall have been removed from the work site. Likewise, brush and trees having a trunk diameter of less than 1O" shall be removed from the site. All stump materials remaining from work conducted under this agreement shall be removed from the site and resulting depressions backfilled with topsoil. 2. Structural Demolition Procedures: Wood frame residential structures not exceeding three stories in height and designed to hold one family will be demolished in such a fashion so that adjacent properties, streets and the general public are protected and safe from damage during demolition. 3. Removal of Debris: All debris must be removed from the work site, including furnaces, heating apparatus, piping, gasoline or oil tanks, miscellaneous fixtures, and stairways. 4. Backfill of the Basement: After removing from the project site all items from the basement that are not an integral part of the structure, the basement shall be backfilled with nonvegetative clean fill, compacted with the backhoe bucket at intervals of every 2 feet of fill . Fill shall be mounded somewhat to prevent "ponding" from occurring.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents