Similar Projects
First Street Gateway - City of Casper
Infrastructure
Conception
$1,621,000 CJ est. value
Casper, WY 82601

First Street Gateway - City of Casper
Infrastructure
Conception
$1,621,000 CJ est. value
Casper, WY 82601

Carbon County County Road 603 Over Four Mile Creek Structure No. Fpx
Demolition, New Construction, Infrastructure
Design
$585,000 CJ est. value
Evansville, WY 82636

Carbon County County Road 603 Over Four Mile Creek Structure No. Fpx
Demolition, New Construction, Infrastructure
Design
$585,000 CJ est. value
Evansville, WY 82636

Casper - Johnson County and Douglas - Glenrock
Infrastructure
Bidding
$2,869,000 CJ est. value
Douglas, WY 82633

Casper - Johnson County and Douglas - Glenrock
Infrastructure
Bidding
$2,869,000 CJ est. value
Douglas, WY 82633

Installation of New Parking Lot Lighting and Enhancement of Current Building Lighting; Air Traffic Control Tower
Infrastructure
Post-Bid
$60,000 CJ est. value
Casper, WY 82604

CPR 070 Rehabilitate Runway 8-26
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Casper, WY 82604

2nd and Lincoln Paving Improvements
Infrastructure
Results
$250,000 est. value
Casper, WY 82605

2022 12th Street Improvements
Infrastructure
Results
$1,100,000 est. value
Casper, WY 82605

Dinosolar Solar Energy System
Infrastructure
Pending Verification
$266,617,340 CJ est. value
Casper, WY 82604

Mountain Acres
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Casper, WY 82601

Poplar Street between 25th and 29th Streets - City of Casper
Infrastructure
Conception
$2,000,000 CJ est. value
Casper, WY 82601

Muddy Gap to Alcova Muddy Gap North/wy 220
Infrastructure
Design
$3,174,000 CJ est. value
Alcova, WY 82620

Drainage Improvements at Manor Heights Elementary School
Infrastructure
Bidding
$1,500,000 CJ est. value
Casper, WY 82609

Last Updated 01/05/2024 04:03 AM
Project Title

Casper MTN CIR DR & Muddy MTN RD

Physical Address View project details and contacts
City, State (County) Casper, WY 82601   (Natrona County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $6,467,376 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Jan 04, 2024 Contract Award Number: 6982AF24C000007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: JMASLMNX1R55 Contractor Awarded Name: STEVE MANNING CONSTRUCTION INC Contractor Awarded Address: Redding, CA 96002 USA Base and All Options Value (Total Contract Value): $6,467,376.50 PROJECT NUMBER: WY FLAP NAT 505 & BL 6409(1) PROJECT NAME: Casper Mtn Cir Dr & Muddy Mtn Rd PROJECT DESCRIPTION: Minor widening/reconstruction and resurfacing, restoration, and rehabilitation (3R) project in Natrona County, Wyoming (approximately 8 miles south of Casper, Wyoming). The proposed project is 12 miles long, generally extending from the intersection of Casper Mountain Circle Drive and Hogadon Road to South Circle Drive, and then continues along Muddy Mountain Road and ends at the Bureau of Land Management (BLM) Campground Loop. The route is used primarily as residential and recreational access to Muddy Mountain and is on rolling terrain with survey elevations ranging from 7,425 feet to 8,292 feet. Proposed improvements include one base schedule and 2 options: Schedule A: BLM Muddy Mountain Road improvements Option X: County Casper Mountain Circle Drive improvements (S-Curve and new pavement portion) Option Y: County Casper Mountain Circle Drive improvements (Full Depth Reclamation [FDR]) OF THE WORK: Both the Schedule and Options require coordination with the County and BLM during construction activities. Casper Mountain Circle Drive provides access to many private residences and Muddy Mountain Road provides access to campgrounds. Schedule A: Muddy Mountain Road is approximately 7.49 miles in length and is aggregate surfaced. The project improvements will rehabilitate and resurface the 4.55 miles of two-lane road and 2.83 miles of single lane aggregate surfaced roads. There are two segments of Muddy Mountain Road consisting of steep grades where new pavement is proposed. There will be four new parking areas, with two of the areas modifying existing parking areas. Additionally, there is a snow fence that will be replaced. Option X: The Casper Mountain Circle Drive segment is 2.33 miles are aggregate surfaced with proposed new pavement. The new typical section will consist of 11-foot lanes and 1-foot shoulders. Additional improvements include curve widening of an S-curve area, reconditioning ditches, adding culverts, and pavement markings and delineators. Option Y: Casper Mountain Circle Drive is approximately 2.65 miles of existing pavement is fatigued and nearing the end of its serviceable life with proposed FDR. Additional improvements include sub excavation, reconditioning ditches, adding culverts, and pavement markings and delineators. PROJECT WY FLAP NAT 505 & BL 6409(1) Casper Mountain County Natrona State Wyoming Length Schedule a: 7.49 Miles Option X: 2.65 Miles Option Y: 2.33 Miles Type of Improvement Road Resurfacing, Restoration, Rehabilitation and New Paving Technical Questions Regarding This Solicitation Will Not Be Accepted After 4 P.m. On November 6, 2023 Questions Can Be Submitted to Cflcontracts@dot.gov. Questions and Answers Will Be Posted at Https://sam.gov The price range of the project work is between $10,000,000 and $20,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. PROJECT NUMBER - 459-20-002

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents