Last Updated | 05/02/2023 01:56 PM |
Project Title | Library Flat Roof Replacement |
Physical Address | View project details and contacts |
City, State (County) | Arcata, CA 95521 (Humboldt County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | College/University, Site Development |
Contracting Method | Bids by Invitation, Competitive Bids |
Project Status | Contract Award, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,708,458 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general, the work consists of the demolition and replacement of multiple generation units throughout the university and associated work per the plans and specifications prepared by Suarez-Kuehne Architects. Any questions should be made in writing to Addie Dunaway at Addie.Dunaway@humboldt.edu before 5:00 p.m. on Monday, February 20, 2023 Bidders must be prequalified with the Trustees and submit their prequalification applications no less than ten (10) business days prior to the bid due date of March 9, 2023. The Trustees require the successful bidder to achieve three percent (3%) DVBE participation in contracting construction projects as established in the bidding documents, and bidders shall identify the DVBEs to be used to satisfy this requirement in their bids. The Trustees use allowances for specific and discrete scopes of Work that are indeterminate at time of bid and may cause allowances to be included in the base bid as estimates for this Work. Examples of allowances include but are not limited to keying, hard rock excavations, special utility permits or utility connection fees. The Trustees shall authorize each debit from an allowance in writing, using a field instruction. Debits from allowances and mark-ups on allowance work performed by subcontractors shall be in accordance with this Article 6. Since allowances are a part of the base Contract Work, Trustees will not award additional mark-up to Contractor for work performed within the allowance by Contractor or any subcontractor. Contractor shall include a six-percent mark-up on a credit change order for any unused portion of an allowance. Work performed in excess of an allowance is subject to normal mark-ups in accordance with this Article 6. The time period for completion of the overall project shall be 180 calendar days from the construction start date as stated on the Notice to Proceed. Liquidated damages shall be $1,000 for each calendar day completion is delayed beyond the time prescribed for the project. Work Included in the Contract: All coordination, construction, and services required for the Cal Poly Humboldt - Library - Flat Roof Replacement project located in Arcata, California including, but not limited to the following: 1. Provide all labor, equipment and materials necessary to complete Cal Poly Humboldt Library Flat Roof Replacement including: demolition of existing roof surface, installation of insulation, new roof surface and roof traffic walk pad; adjusting and re-anchoring of existing roof vents and equipment onto raised curbs; demolition and removal of an existing generator and associated piping; removal of debris; replacement of existing roof drains and installation of additional overflow roof drains, sensors and notification system and associated plumbing and electrical services; removal, patching and installation of cementitious plaster walls; painting of walls and exposed piping; design and installation of a fall protection roof anchorage system as described within the drawings and technical documents and other information included herein. 2. Contractor shall be responsible to protect adjacent areas and furniture from dust, smells, and noise pollution resulting from construction activities, using a method that meets University approval prior to installation. 3. Contractor shall be responsible to field verify all dimensions. 4. Contractor shall access the area of construction only through those entries designated within the Construction & Laydown Area Map. Should operations require access via other entries, such shall be coordinated and authorized, in advance, with the University's Project Manager |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |