Similar Projects
Last Updated | 09/18/2019 10:58 AM |
Project Title | Prepare Site, Furnish and Install Prefabricated Metal Building, Hanscom Air Force Base, Concord, MA |
Physical Address | View project details and contacts |
City, State (County) | Concord, MA (Middlesex County) |
Category(s) | Commercial |
Sub-Category(s) | Warehouse/Storage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Prepare site, furnish and install prefabricated metal building in accordance with requirements at Hanscom Air Force Base: Provide all materials, labor, testing, and equipment for performing all operations necessary to complete the following work: - Install 14 feet wide x 22 feet long x 12 feet high peaked roof pre-fabricated metal building. - Pour 8 inches (minimum) reinforced concrete slab with 4 feet x 9 feet concrete ramp at roll-up door. - Pour 8 inches (minimum) wall and footing thickness and 16 inches wide (minimum) footing reinforced concrete strip (continuous) footing foundation around the perimeter of the pre-fabricated metal building. Foundation wall shall extend 6 inches above finished grade and extend below frost line as required by the 9th edition of the Massachusetts State Building Code. - Apply 12 inches of 1-1/2 inch crushed stone base beneath the concrete slab and footing. - Install one 8 feet x 8 feet roll-up door and two 42 inches wide (6 feet 8 inches high) metal personnel doors. - Install a 120V, 50A electrical subpanel inside the new building. An empty electrical conduit is already run to the site. Install (2) 3AWG + (1) 10AWG in the existing conduit (NTE 150 linear feet) to feed the new subpanel. - Install a minimum of four duplex 20A GFCI electrical receptacles around the interior perimeter of the building. - Install interior LED lighting controlled by switch near access door, and exterior LED lighting above the roll-up door with sensors required. | ||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |