Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

New Science and Activities Building
New Construction - 35,000 SF
Design
$1,000,000 est. value
Emsworth, PA 15202

New Public Works Facilities
New Construction, Alteration
Post-Bid
$100,000 est. value
Swissvale, PA 15218

Construct Classroom at Main Station Farm
New Construction, Infrastructure - 6,000 SF
Post-Bid
$4,038,319 CJ est. value
Reno, NV 89502

Gateway Middle School - Additions & Renovations (General Construction)
Renovation
Results
Monroeville, PA 15146

Alterations and Addition Hampton High School - General Construction
Renovation, Addition
Results
Allison Park, PA 15101

The Gene Deal Fields
Renovation
Construction
$2,100,000 est. value
Fox Chapel, Pittsburgh, PA 15238

Pittsburgh Airport Innovation Campus Site Development Phase 2 at Pittsburgh International Airport
Infrastructure
Construction
Pittsburgh, PA 15231

The Julian Apartments / Pittsburgh
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Pittsburgh, PA 15213

Fairywood Industrial Development
New Construction, Infrastructure - 150,000 SF
Pending Verification
$7,000,000 CJ est. value
Pittsburgh, PA 15219

Mars Valencia Rd Culvert
Demolition, New Construction, Infrastructure
Conception
$300,000 CJ est. value
Pine Township, PA 15090

Skinny Building & Roberts Building Renovation
Demolition, New Construction, Renovation, Infrastructure
Design
$700,000 CJ est. value
Pittsburgh, PA 15222

Landscaping & Snow Removal
Renovation
Post-Bid
Pittsburgh, PA 15235

Last Updated 02/27/2023 11:17 AM
Project Title

Avonworth Middle and High School Additions and Renovations

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15237   (Allegheny County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Construction Manager - 04/19/22
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 27, 2023, all contracts have been awarded. A firm construction timeline has not been disclosed.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents