Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Design Build Multiple Award Task Order Contract
New Construction
Post-Bid
$500,000 to $10,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

S--Base Operations Support (BOS) Services Located at the Marine Corps Base Quantico, VA
Results
Quantico, VA

Barracks 1 and 2 Renovation
Renovation
Construction
Manassas, VA

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

D/B Northeast MATOC
Post-Bid
$1,000,000 to $250,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Design
$250,000 to $5,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Post-Bid
Less than $150,000,000 est. value

Job Order Contracts (Joc) Region C
New Construction, Renovation
Results
$10,000,000 est. value

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

Reported 03/04/2020 12:00 AM
Project Title

Spittle Office Building Addition

Physical Address View project details and contacts
City, State (County) Woodbridge, VA 22192   (Prince William County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the construction of a new 41,766 square foot Spittle Office Building Addition with associated site work and expanded parking capacity (the Project). The new addition is constructed on three levels. The top two levels align with the floor levels of the existing building, with the lowest level completely below grade on the west side and walking out at grade on the east. The Spittle Office Building Addition is designed to appear as a seamless extension of the existing building, while incorporating more contemporary glass elements. The building is oriented to conform to the existing site grades and extends northward toward the wooded end of the site. New parking capacity of one-hundred (100) spaces will be added to the west of the addition, accessed from a new vehicle entry off County Complex Court and connected through the site to the existing parking lots.

Details

1 Misc. Buildings, 41,766 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents