Project Title | Ford Road Booster Station Improvements - Discharge Pressure Control |
Physical Address | View project details and contacts |
City, State (County) | Dearborn Heights, MI (Wayne County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Remove and replace one (1) 24-inch valve and nine (9) 18-inch valves for total of ten (10) pump isolation valves with triple offset butterfly valves of same size. 2. Remove and replace one (1) 24-inch valve and nine (9) 18-inch valves for total of ten (10) pump control valves with metal seated ball valves of same size; Replace associated existing hydraulic actuator for each of the control valve with electric actuator for a total of 10 electric actuators. 3. Remove and replace one 16-inch cone valve in a relocated positon with a new dismantling joint and new electric actuator. 4. Remove and replace existing 24-inch isolation valve located u/s of 16-inch cone reservoir fill valve. 5. Install new 16-inch isolation valve d/s of relocated 16-inch cone reservoir fill valve. 6. Remove existing 12-inch recirculation cone valve and replace with equivalent length of pipe | ||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |