Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Lawrence Drive/Teller Road Intersection Improvements
Infrastructure
Bidding
Thousand Oaks, CA 91362

Construction of Roadway Paving on Lytle Avenue from W. Cecil Way to County Line Road
Infrastructure
Bidding
$1,436,028 est. value
Delano, Sacramento, CA 95811

Campus Wayfinding and Signage Plan
Alteration
Post-Bid
La Verne, Walnut, CA 91789

Rosedale Highway Widening-Segment 2
Alteration
Post-Bid
Bakersfield, CA 93312

Paving Of Residential And Major Streets Rehabilitation Project
Infrastructure
Results
$1,500,000 est. value
Baldwin Park, CA 91797

Install Wired Mesh Drapery System and Slope and Roadside Paving
Infrastructure
Results
$2,880,000 est. value
CA

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure
Construction
$20,000,000 est. value
San Gabriel, CA 91776

Construction of Traffic Signal on Manor Street at Day Avenue
Infrastructure
Bidding
$838,419 est. value
Bakersfield, Oildale, CA 93314

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

Cold Plane Ac and Overlay with Hma and Rhma-G
Infrastructure
Results
$6,000,000 est. value
CA

Traffic Signal & Street Lighting Equipment
Infrastructure, Alteration
Post-Bid
Long Beach, CA 90899

Traffic Signal At Lake Isabella Boulevard And Elizabeth Norris Road
Infrastructure
Results
$754,768 est. value
Lake Isabella, CA 93240

Modify Signal, Lighting and Ramp Metering Systems
Infrastructure
Post-Bid
$760,000 est. value
CA

Last Updated 10/29/2021 02:15 AM
Project Title

Street Lights, Traffic Signals and Damaged Concrete Replacement

Physical Address View project details and contacts
City, State (County) (Kern, Los Angeles, Ventura Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

DVBE-3%.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents