Similar Projects
Fort Bliss Paving IDIQ
Design
$10,000,000 to $25,000,000 est. value
Fort Bliss, TX

Construction of the 2020 Street Maintenance Program
Infrastructure
Bidding
Horizon City, TX

Gene Torres NTMP
Post-Bid
$200,000 to $300,000 est. value
El Paso, TX

Bowie Driveway Pavement and Drainage Improvement
Post-Bid
El Paso, TX

Southern Region Disaster Recovery Support BPA
Results

2020 Road and Bridge Paving Project
Results
El Paso, TX 79901

2021 Road and Bridge Paving Project
Post-Bid
El Paso, TX

South Central Street and Drainage Improvements Phase IV - Edna and Dolan
Results
El Paso, TX

Comprehensive Tactical Infrastructure Maintenance and Repair (CTIMR) for Big Bend Sector and El Paso Sector In Texas
Post-Bid
$750,000 est. value
El Paso, TX

Lowd Avenue Reconstruction
Results
$2,400,000 to $2,600,000 est. value
El Paso, TX 79901

As-Needed Paving Emulsion Material
Results
$1,122,000 to $1,164,000 est. value
El Paso, TX

Ted Houghton Drive Roadway Reconstruction Project
Results
El Paso, TX

Roadway Spall and Full Depth Repair
Results
Less than $776,750 est. value
TX

2020 Road and Bridge Crack Sealing Project
Results
El Paso, TX 79901

Mill and Inlay (Frontage Road)
Results
Less than $1,029,342 est. value
TX

Last Updated 07/05/2021 07:07 AM
Project Title

FM 659 - Hazard Elimination and Safety

Physical Address View project details and contacts
City, State (County) TX   (El Paso County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,566,725
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 455.000 1 104 6009 Removing Conc (Riprap) Sy 631.000 2 104 6011 Removing Conc (Medians) Sy 269.000 3 104 6015 Removing Conc (Sidewalks) Sy 4.000 4 104 6017 Removing Conc (Driveways) Sy 122.000 5 104 6021 Removing Conc (Curb) Lf 25.000 6 104 6029 Removing Conc (Curb Or Curb & Gutter) Lf 1,113.000 7 104 6036 Removing Conc (Sidewalk Or Ramp) Sy 54.000 8 110 6001 Excavation (Roadway) Cy 2,702.000 9 110 6003 Excavation (Special) Cy 26.000 10 132 6001 Embankment (Final)(Ord Comp)(Ty A) Cy 7,206.000 11 134 6002 Backfill (Ty B) Sta 151.000 12 340 6050 D-Gr Hma(Sq) Ty-C Pg70-22 Ton 678.000 13 340 6272 Tack Coat Gal 945.500 14 348 6003 Tbwc (Asphalt)(Pg 76-22) Ton 326.000 15 348 6007 Tbwc (Membrane) Gal 34,273.000 16 348 6013 Tbwc (Aggregate) (Ty C) (Sac-A) Ton 5,515.000 17 351 6002 Flexible Pavement Structure Repair(6") Sy 53,012.000 18 351 6004 Flexible Pavement Structure Repair(8") Sy 4,915.000 19 354 6041 Plane Asph Conc Pav (1.5") Sy 172,920.000 20 354 6045 Plane Asph Conc Pav (2") Sy 22,841.000 21 354 6146 Plane Asph Conc Pav (1.5"-2") Sy 2,448.000 22 416 6029 Drill Shaft (Rdwy Ill Pole) (30 In) Lf 1,960.000 23 416 6032 Drill Shaft (Trf Sig Pole) (36 In) Lf 40.000 24 420 6007 Cl A Conc (Flume) Cy 12.000 25 432 6001 Riprap (Conc)(4 In) Cy 4.000 26 432 6031 Riprap (Stone Protection)(12 In) Cy 2.400 27 442 6012 Str Steel (Rails / Posts / Plates) Lb 3,894.500 28 450 6050 Rail (Handrail)(Ty D) Lf 210.000 29 479 6001 Adjusting Manholes Ea 4.000 30 479 6005 Adjusting Manholes (Water Valve Box) Ea 1.000 31 479 6010 Adjusting Manholes (Electric Box) Ea 12.000 32 479 6012 Adjusting Manholes (Telephone Box) Ea 4.000 33 500 6001 Mobilization Ls 1.000 34 502 6001 Barricades, Signs And Traffic Handling Mo 15.000 35 506 6003 Rock Filter Dams (Install) (Ty 3) Lf 60.000 36 506 6011 Rock Filter Dams (Remove) Lf 60.000 37 506 6020 Construction Exits (Install) (Ty 1) Sy 312.000 38 506 6024 Construction Exits (Remove) Sy 312.000 39 506 6035 Sandbags For Erosion Control Ea 428.000 40 506 6038 Temp Sedmt Cont Fence (Install) Lf 33,698.000 41 506 6039 Temp Sedmt Cont Fence (Remove) Lf 33,698.000 42 506 6040 Biodeg Erosn Cont Logs (Instl) (8") Lf 953.000 43 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 953.000 44 512 6021 Port Ctb (Des Source)(Low Prof)(Ty 1) Lf 2,420.000 45 512 6022 Port Ctb (Des Source)(Low Prof)(Ty 2) Lf 80.000 46 512 6045 Port Ctb (Stkpl)(Low Prof)(Ty 1) Lf 2,420.000 47 512 6046 Port Ctb (Stkpl)(Low Prof)(Ty 2) Lf 80.000 48 528 6001 Colored Textured Conc (4") Sy 14,531.000 49 529 6002 Conc Curb (Ty Ii) Lf 3,947.000 50 529 6005 Conc Curb (Mono) (Ty Ii) Lf 1,103.000 51 529 6008 Conc Curb & Gutter (Ty Ii) Lf 77.000 52 529 6013 Conc Curb (Special) (Type Ii) Lf 82,992.000 53 529 6015 Conc Curb (Ty C1) Lf 799.000 54 529 6016 Conc Curb (Ty F1) Lf 100.000 55 529 6018 Conc Curb (Ty F3) Lf 50.000 56 530 6004 Driveways (Conc) Sy 1,593.000 57 531 6001 Conc Sidewalks (4") Sy 15,824.000 58 531 6003 Conc Sidewalks (6") Sy 90.000 59 531 6004 Curb Ramps (Ty 1) Ea 13.000 60 531 6006 Curb Ramps (Ty 3) Ea 5.000 61 531 6013 Curb Ramps (Ty 10) Ea 2.000 62 531 6016 Curb Ramps (Ty 21) Ea 29.000 63 531 6038 Curb Ramps (Ty 10) (Mod) Ea 1.000 64 540 6028 Downstream Anchor Terminal Sect (Ty Iv) Ea 1.000 65 542 6001 Remove Metal Beam Guard Fence Lf 319.000 66 542 6002 Remove Terminal Anchor Section Ea 1.000 67 544 6003 Guardrail End Treatment (Remove) Ea 1.000 68 560 6025 Relocate Existing Mailbox Ea 11.000 69 610 6009 Remove Rd Il Asm (Trans-Base) Ea 171.000 70 610 6101 Replace Luminaire W/Led (150w Eq) Ea 4.000 71 610 6102 Replace Luminaire W/Led (250w Eq) Ea 2.000 72 610 6161 In Rd Il (Ty Sa) 30t-4-4 (250w Eq) Led Ea 245.000 73 618 6023 Condt (Pvc) (Sch 40) (2") Lf 37,605.000 74 618 6024 Condt (Pvc) (Sch 40) (2") (Bore) Lf 4,948.000 75 618 6029 Condt (Pvc) (Sch 40) (3") Lf 354.000 76 618 6030 Condt (Pvc) (Sch 40) (3") (Bore) Lf 2,023.000 77 618 6070 Condt (Rm) (2") Lf 64.000 78 620 6002 Elec Condr (No.14) Insulated Lf 1,780.000 79 620 6006 Elec Condr (No.10) Insulated Lf 35,118.000 80 620 6008 Elec Condr (No.8) Insulated Lf 44,433.000 81 620 6010 Elec Condr (No.6) Insulated Lf 58,822.000 82 624 6002 Ground Box Ty A (122311)W/Apron Ea 99.000 83 624 6008 Ground Box Ty C (162911)W/Apron Ea 7.000 84 624 6010 Ground Box Ty D (162922)W/Apron Ea 1.000 85 624 6014 Ground Box Ty 1 (122422)W/Apron Ea 8.000 86 624 6028 Remove Ground Box Ea 86.000 87 628 6006 Elc Srv Ty A 120/240 060(Ns)Ss(E)Gc(O) Ea 2.000 88 628 6008 Elc Srv Ty A 120/240 060(Ns)Ss(E)Ps(U) Ea 1.000 89 628 6041 Elc Srv Ty A 240/480 060(Ns)Ss(E)Gc(O) Ea 6.000 90 628 6128 Elc Srv Ty D 120/240 060(Ns)Gs(N)Gc(O) Ea 1.000 91 636 6001 Aluminum Signs (Ty A) Sf 233.000 92 644 6001 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(P) Ea 56.000 93 644 6004 In Sm Rd Sn Sup&Am Ty10bwg(1)Sa(T) Ea 7.000 94 644 6067 In Sm Rd Sn Sup&Am (Inst Sign Only) Ea 30.000 95 644 6068 Relocate Sm Rd Sn Sup&Am Ty 10bwg Ea 28.000 96 644 6076 Remove Sm Rd Sn Sup&Am Ea 10.000 97 662 6060 Wk Zn Pav Mrk Remov (W)4"(Brk) Lf 52,009.000 98 662 6063 Wk Zn Pav Mrk Remov (W)4"(Sld) Lf 115,174.000 99 662 6071 Wk Zn Pav Mrk Remov (W)8"(Sld) Lf 61,721.000 100 662 6073 Wk Zn Pav Mrk Remov (W)12"(Sld) Lf 4,397.000 101 662 6075 Wk Zn Pav Mrk Remov (W)24"(Sld) Lf 1,425.000 102 662 6080 Wk Zn Pav Mrk Remov (W)(Arrow) Ea 171.000 103 662 6090 Wk Zn Pav Mrk Remov (W)(Word) Ea 42.000 104 662 6093 Wk Zn Pav Mrk Remov (Y)4"(Brk) Lf 18,422.000 105 662 6095 Wk Zn Pav Mrk Remov (Y)4"(Sld) Lf 205,771.000 106 666 6029 Refl Pav Mrk Ty I (W)8"(Dot)(090mil) Lf 1,339.000 107 666 6035 Refl Pav Mrk Ty I (W)8"(Sld)(090mil) Lf 37,311.000 108 666 6047 Refl Pav Mrk Ty I (W)24"(Sld)(090mil) Lf 7,445.000 109 666 6053 Refl Pav Mrk Ty I (W)(Arrow)(090mil) Ea 176.000 110 666 6056 Refl Pav Mrk Ty I(W)(Dbl Arrow)(090mil) Ea 2.000 111 666 6077 Refl Pav Mrk Ty I (W)(Word)(090mil) Ea 176.000 112 666 6098 Ref Pav Mrk Ty I(W)18"(Yld Tri)(090mil) Ea 5.000 113 666 6170 Refl Pav Mrk Ty Ii (W) 4" (Sld) Lf 28,867.000 114 666 6171 Refl Pav Mrk Ty Ii (W) 6" (Brk) Lf 19,999.000 115 666 6176 Refl Pav Mrk Ty Ii (W) 8" (Dot) Lf 1,339.000 116 666 6178 Refl Pav Mrk Ty Ii (W) 8" (Sld) Lf 37,311.000 117 666 6182 Refl Pav Mrk Ty Ii (W) 24" (Sld) Lf 7,445.000 118 666 6184 Refl Pav Mrk Ty Ii (W) (Arrow) Ea 176.000 119 666 6185 Refl Pav Mrk Ty Ii (W) (Dbl Arrow) Ea 2.000 120 666 6192 Refl Pav Mrk Ty Ii (W) (Word) Ea 176.000 121 666 6198 Refl Pav Mrk Ty Ii (W) 18" (Yld Tri) Ea 5.000 122 666 6207 Refl Pav Mrk Ty Ii (Y) 4" (Sld) Lf 488.000 123 666 6283 Ref Prof Pav Mrk Ty I(W)4"(Sld)(090mil) Lf 25,517.000 124 666 6302 Re Pm W/Ret Req Ty I (W)4"(Sld)(090mil) Lf 3,350.000 125 666 6305 Re Pm W/Ret Req Ty I (W)6"(Brk)(090mil) Lf 19,999.000 126 666 6314 Re Pm W/Ret Req Ty I (Y)4"(Sld)(090mil) Lf 488.000 127 666 6440 Refl Pav Mrk Ty Ii (Y)(Curb) Lf 3,497.000 128 672 6007 Refl Pav Mrkr Ty I-C Ea 15.000 129 672 6009 Refl Pav Mrkr Ty Ii-A-A Ea 56.000 130 672 6010 Refl Pav Mrkr Ty Ii-C-R Ea 4,188.000 131 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 57,538.000 132 677 6003 Elim Ext Pav Mrk & Mrks (8") Lf 16,519.000 133 677 6005 Elim Ext Pav Mrk & Mrks (12") Lf 6,774.000 134 677 6007 Elim Ext Pav Mrk & Mrks (24") Lf 1,995.000 135 677 6008 Elim Ext Pav Mrk & Mrks (Arrow) Ea 77.000 136 677 6009 Elim Ext Pav Mrk & Mrks (Dbl Arrow) Ea 2.000 137 677 6012 Elim Ext Pav Mrk & Mrks (Word) Ea 18.000 138 678 6001 Pav Surf Prep For Mrk (4") Lf 1,599.000 139 678 6002 Pav Surf Prep For Mrk (6") Lf 9,925.000 140 678 6004 Pav Surf Prep For Mrk (8") Lf 19,746.000 141 678 6008 Pav Surf Prep For Mrk (24") Lf 3,977.000 142 678 6009 Pav Surf Prep For Mrk (Arrow) Ea 94.000 143 678 6010 Pav Surf Prep For Mrk (Dbl Arrow) Ea 2.000 144 678 6016 Pav Surf Prep For Mrk (Word) Ea 94.000 145 680 6003 Install Hwy Trf Sig (System) Ea 1.000 146 682 6002 Veh Sig Sec (12")Led(Grn Arw) Ea 2.000 147 682 6003 Veh Sig Sec (12")Led(Yel) Ea 8.000 148 682 6004 Veh Sig Sec (12")Led(Yel Arw) Ea 4.000 149 682 6005 Veh Sig Sec (12")Led(Red) Ea 8.000 150 682 6018 Ped Sig Sec (Led)(Countdown) Ea 8.000 151 682 6049 Backplate W/Refl Brdr(4 Sec) Ea 2.000 152 682 6060 Backplate W/Refl Brdr(3 Sec) Ea 8.000 153 684 6007 Trf Sig Cbl (Ty A)(12 Awg)(2 Condr) Lf 1,201.000 154 684 6010 Trf Sig Cbl (Ty A)(12 Awg)(5 Condr) Lf 1,621.000 155 684 6012 Trf Sig Cbl (Ty A)(12 Awg)(7 Condr) Lf 1,149.000 156 684 6054 Trf Sig Cbl (Ty A)(18 Awg)(3 Condr) Lf 853.000 157 686 6033 Ins Trf Sig Pl Am(S)1 Arm(32') Ea 1.000 158 686 6041 Ins Trf Sig Pl Am(S)1 Arm(40') Ea 1.000 159 686 6045 Ins Trf Sig Pl Am(S)1 Arm(44') Ea 1.000 160 687 6001 Ped Pole Assembly Ea 8.000 161 688 6001 Ped Detect Push Button (Aps) Ea 8.000 162 688 6003 Ped Detector Controller Unit Ea 8.000 163 690 6067 Removal Of Luminaire Mast Arms Ea 29.000 164 700 6001 Pothole Repair (Standard) Sy 600.000 165 1005 6001 Loose Aggr For Groundcover (Type I) Cy 1,424.000 166 3002 6001 Membrane Underseal Gal 31,159.000 167 3004 6006 Spot Diamond Grinding Asph Pvmt Sy 15,559.000 168 3076 6024 D-Gr Hma Ty-C Sac-A Pg70-22 Ton 17,136.000 169 6007 6020 Fiber Optic Pigtail (12 Fiber) Lf 1,780.000 170 6007 6021 Fiber Optic Splice Enclosure Ea 1.000 171 6007 6026 Fiber Optic Cable Road Marker Ea 3.000 172 6007 6094 Fiber Optic Fusion Splice Ea 4.000 173 6027 6008 Ground Box (Prepare) Ea 1.000 174 6185 6002 Tma (Stationary) Day 736.000 175 6185 6005 Tma (Mobile Operation) Day 396.000 176 6306 6001 Vivds Prosr Sys Ea 4.000 177 6306 6002 Vivds Cam Assy Fxd Lns Ea 4.000 178 6306 6005 Vivds Cntrl Software Ea 1.000 179 6394 6001 Smart Photocontrol Ea 476.000 180

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents