Similar Projects
Install Pumps and Well House for Well No.4 and No.5 - City of Flowery Branch
Infrastructure
Conception
$950,000 CJ est. value
Flowery Branch, GA 30542

Mulberry Creek Back Pumping and Pump Station Rehabilitation - Hall County
Renovation, Infrastructure
Conception
$7,289,190 CJ est. value
Gainesville, GA 30501

Riverside Drive WTP High Service Pump No. 5 Modifications
Renovation
Bidding
$2,000,000 CJ est. value
Gainesville, GA 30501

RFP D/B - Upgrade Lower Crooked Creek No. 2 (LCC 2) Pump Station
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Decatur, GA 30030

Facility Maintenance Services - Annual Contract
Term Contract
Post-Bid
GA

Oostanaula Pump Station Traveling Screen Rebuild
Renovation
Post-Bid
Rome, GA

Sanitary Sewer System Extension
New Construction, Infrastructure
Results
$579,875 est. value
Lyons, GA 30436

Spot Road Pump Station And Gravity Sewer
New Construction, Infrastructure
Results
$2,075,140 est. value
Cumming, GA 30040

Cobb Tunnel Sewer Connection
Renovation, Infrastructure
Construction
$6,407,915 CJ est. value
Douglasville, GA 30134

RFP Design - Booster Pump Station
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Guyton, GA 31312

Tom Miller and Highway 81 Pump Stations Upgrade - Barrow County
Renovation
Conception
$250,000 CJ est. value
Bethlehem, GA 30620

P658 Nuclear Regional Maintenance Facility (Nrmf), Naval Submarine Base Kings Bay
Demolition, New Construction, Infrastructure, Renovation - 147,539 SF
Bidding
$250,000,000 CJ est. value
Kings Bay, GA 31547

Maple Street Pump Station Reconstruction
Renovation
Post-Bid
Bloomingdale, GA 31302

Pump Station 2002 Force Main Replacement
Renovation, Infrastructure
Results
Brunswick, GA

12" Water Main from Cash Road to Highway 211 - Barrow County
Renovation
Conception
$250,000 CJ est. value
Flowery Branch, GA 30542

Last Updated 04/14/2023 10:28 AM
Project Title

Villa Rosa Lift Station Upgrades

Physical Address View project details and contacts
City, State (County) Temple, GA 30179   (Carroll County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Sub-Bidding Closed, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

All Bidders must have a State of Georgia Utility Contractor License and must employ a state "Utility Manager" certificate holder who will have oversight of all the work. The work to be done consists of furnishing all materials, equipment and labor for the construction of: Upgrade of the existing Villa Rosa Lift Station including new cast in place rectangular wet well and valve vault, new submersible pumps and generator set, all complete with appurtenances Time allotted for construction is 335 consecutive calendar days for substantial completion and 365 days for final completion. Proposals for the complete work in one general contract shall be made on the proposal form provided and shall contain prices in words and figures for the work bid on. All proposals shall be accompanied by a Bid Bond drawn in favor of the City of Temple, in the amount of at least 10% of the lump sum bid for the complete work; such Bid Bond representing that the Bidder, if awarded the contract, will promptly enter into a contract and furnish Performance Bond and Payment Bond as provided by law and approved by the Attorney for the City of Temple. Each bond shall be equal to 100% of the contract amount. The Bid Bond shall be forfeited to the City of Temple as liquidated damages if the Bidder fails to execute the contract and provide Performance and Payment Bonds within 10 days after being notified that he has been awarded the contract Upon receipt of all documents in undamaged condition within 30 days after the date of opening of bids, half of the deposit will be refunded. The difference between the deposit and the amount refunded represents the cost of reproduction. No refund will be made for documents received after 30 days or in damaged condition. The Owner reserves the right to reject any or all bids and to waive informalities.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents