Project Title | Fencing and Road Realignment Project - City of Ashland |
Physical Address | View project details and contacts |
City, State (County) | Ashland, OR 97520 (Jackson County) |
Category(s) | Heavy and Highway, Transportation |
Sub-Category(s) | Airline/Passenger Terminal, Paving/Reconstruction, Runways/Taxiways, Site Development |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected March 2025 |
Bids Due | View project details and contacts |
Estimated Value | $595,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Fencing currently exists along the majority of the southern Airport boundary along Dead Indian Memorial Road. The remaining perimeter of the Airport is unfenced. Preliminary project planning to construct a full-length perimeter fence along the remaining portions of Airport property occurred but the project was postponed due to siting constraints and environmental concerns. When constructed, the FAA generally requires perimeter fencing encompass all airport property to satisfy safety concerns. In the 2019 Airport Master Plan it recommended that a full-length perimeter fence be installed and include the private road realignment as part of this alternative project. The road was identified as needing realigned to accommodate the runway and apron expansions. This project is in included in the City of Ashland FY 2022 - 2027 Capital Improvements Plan. As of November 08, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |