Similar Projects
Last Updated | 01/04/2022 02:32 PM |
Project Title | Wilson Park Creek Reach 3 Phase 1 - Detention Basin |
Physical Address | View project details and contacts |
City, State (County) | Milwaukee, WI (Milwaukee County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project contemplated consists primarily of: Approximately 226,000 cubic yards of excavation for the initial construction of a floodwater detention basin, including hauling the majority of the excavated material to an Owner designated site in Oak Creek; Excavation and management of approximately 75 cubic yards of environmentally impacted soil including hauling and disposal at a WDNR-approved landfill; Control of water during construction; Construction of concrete pavement and fencing at the site entrance adjacent to South 6th Street;Modifications to existing storm sewers and installation of the storage basin outlet pipeline; Placement of topsoil and approximately 11 acres of native lowland and upland seeding; A four-year vegetation maintenance period which may be assigned at Owner’s sole discretion to a separate pre-approved subcontractor at the completion of the applicable construction milestone as specified; All other related work |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |