Last Updated 01/04/2022 02:32 PM
Project Title

Wilson Park Creek Reach 3 Phase 1 - Detention Basin

Physical Address View project details and contacts
City, State (County) Milwaukee, WI   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project contemplated consists primarily of: Approximately 226,000 cubic yards of excavation for the initial construction of a floodwater detention basin, including hauling the majority of the excavated material to an Owner designated site in Oak Creek; Excavation and management of approximately 75 cubic yards of environmentally impacted soil including hauling and disposal at a WDNR-approved landfill; Control of water during construction; Construction of concrete pavement and fencing at the site entrance adjacent to South 6th Street;Modifications to existing storm sewers and installation of the storage basin outlet pipeline; Placement of topsoil and approximately 11 acres of native lowland and upland seeding; A four-year vegetation maintenance period which may be assigned at Owner’s sole discretion to a separate pre-approved subcontractor at the completion of the applicable construction milestone as specified; All other related work

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Excavation and Fill, Riprap.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents