Similar Projects
Ayer Street Water Line- City of Barre
Infrastructure
Conception
$510,000 CJ est. value
Barre, VT 05641

Brook Street Water Line - City of Barre
Infrastructure
Conception
$240,000 CJ est. value
Barre, VT 05641

Granite Shed Lane Development
New Construction, Infrastructure - 6,000 SF
Design
$1,200,000 CJ est. value
Montpelier, VT 05602

Copley Mansfield Orthopaedics Medical Office
New Construction, Infrastructure - 9,990 SF
Design
$5,800,000 CJ est. value
Waterbury, VT 05676

Bituminous Concrete Paving
Infrastructure
Bidding
$200,000 CJ est. value
Barre, VT 05641

Bridge 37
Infrastructure
Bidding
$90,000 CJ est. value
Duxbury, VT 05676

Lake Carmi Wastewater Filter Pod Maintenance
Infrastructure
Post-Bid
$35,000 est. value
Montpelier, VT

Warren Covered Bridge Rehabilitation - Rebid
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Warren, VT 05674

State Street Sewer and Drainage Improvements
Infrastructure
Results
$846,325 CJ est. value
Montpelier, VT 05602

Peacham - Marshfield STP Culvert(95)
Infrastructure
Results
$205,622 CJ est. value
Marshfield, VT 05658

Spruce Place
New Construction - 27,122 SF
Construction
$2,493,540 est. value
Berlin, VT

Yestermorrow Dormitory 1
New Construction - 1,250 SF
Construction
$70,000 est. value
Waitsfield, VT 05673

Vermont Foodbank
Addition, Demolition, Renovation, Infrastructure - 5,626 SF
Pending Verification
$607,608 CJ est. value
Barre, VT 05641

Barre Road Industrial Building
New Construction, Infrastructure - 4,200 SF
Pending Verification
$500,000 CJ est. value
Barre, VT 05641

Hill Street Water Line (Upper) - City of Barre
Infrastructure
Conception
$220,000 CJ est. value
Barre, VT 05641

Last Updated 03/03/2023 01:08 PM
Project Title

The Bridges Resort - Water Treatment System Improvements

Physical Address View project details and contacts
City, State (County) Warren, VT 05674   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $425,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work includes modifications to a water storage tank, modifications of an existing buried vault, construction of a new water treatment building, construction of weatherproof enclosures for well control equipment, and demolition and disposal of the existing well control building

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents