Similar Projects
Drain Degreaser Services
Term Contract
Bidding
Moody AFB, GA

Goodyear Clubhouse Renovation - Plumbing
Bidding
Cartersville, GA 30120

Plumbing Renovations
Post-Bid
Thomasville, GA 31757

Hot Water Heater Replacements
Post-Bid
Athens, GA

Plumbing Services 2019
Term Contract
Results
Warner Robins, GA

Electrician Services 2019
Term Contract
Results
Warner Robins, GA

Demolition Services
Bidding
Perry, GA 31069

45--Sink and Plumbing Installation
Post-Bid
Fort Benning, GA 31905

Government Center Building Plumbing
Results
Gray, GA

Copper Tubing
Post-Bid
GA

Plumbing Services for Clayton County
Results
Riverdale, GA 30274

Columbus State University Corn Center Piping Replacement
Post-Bid
Columbus, GA 31901

Grady High School - Plumbing to Modular Units
Results
Atlanta, GA 30309

Kitchen Grease Trap Cleaning (Annual Contract)
Term Contract
Post-Bid
GA

Plumbing Services
Results
GA

Last Updated 02/26/2021 09:26 AM
Project Title

Jail Plumbing Renovations

Physical Address View project details and contacts
City, State (County) Conyers, GA 30012   (Rockdale County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bid must include: • Demo all plumbing in secure plumbing chases to include sewer, tempered mixing valves and clean water plumbing. • Existing fixtures inside pod areas must be retro fitted for new water control devices. (which includes toilets, lavatories and showers) • It is the responsibly of contractor to purchase all plumbing parts (pipes, control devices and fittings to complete job. • Contractor must install isolation valves for 1st and 2nd floor inside secure plumbing chase, new supply pipes will be copper with new ball valves. • Each secure plumbing chase must have a new standalone tempered water mixing valve installed with isolation valves for tempered water. (minimum working rate of .5 GPM water flow) • All shower drains must have new vandal proof covers installed with proper drain slope. Contractor will pour and repair concrete for shower drains. • All drainpipes must connect to the closest possible point of fixture, contractor may use PVC piping for drain lines. • New drainpipes will connect to old pipes in ground of secure plumbing chase. • All water control devices, which includes toilets, lavatories and showers will be I-CON System equipment. (Each chase has one 15amp receptacle) • I-CON LED pressure sensors will be used for toilet activation. • I-CON Force Activated Touch Sensor will be used on lavatories and showers • I-CON NEXUS AC Communication-Capable Controller will be used. • I-CON Dual Temperature Manifolds will be used for lavatory. • I-CON Pre-Tempered Manifold Shower Valves will be used for showers. • I-CON New Work Flush Valves will be used. • All painting and minor finish work will be the responsibility of Rockdale county sheriff’s office.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents