Similar Projects
Landscaping and Buffering Regulations Update
Infrastructure
Bidding
Tumwater, WA

High Capacity Transportation Study
Alteration
Bidding
$210,000 est. value
Olympia, WA

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

Electrical Engineering Services
Infrastructure
Post-Bid

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

On-Call Consulting Services
New Construction, Infrastructure
Post-Bid
Olympia, WA

Conduct Bridge Load Ratings
New Construction, Infrastructure
Results
Olympia, WA

Rfq Multiple Engineering Service
Term Contract
Post-Bid

Engineering Consulting Services for Design and Construction of the Boulevard Road Reservoir Rehabilitation
Infrastructure
Results
Olympia, WA

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Last Updated 07/26/2022 08:38 AM
Project Title

RFQ - Update of Puget Sound Salmon Recovery Plan Local Watershed Chapters

Physical Address View project details and contacts
City, State (County) Olympia, WA 98501   (Thurston County)
Category(s) Professional Services, Sewer and Water
Sub-Category(s) Architectural, Engineering, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work with two local watersheds (lead entities) by providing coaching support to incorporate new information (including identifying limiting factors) for Puget Sound Chinook salmon and (where applicable) steelhead recovery into their local recovery chapters and develop adaptive management strategies. Work with the two local watersheds (lead entities) to update their Chinook salmon and (where applicable) develop steelhead recovery strategies for their local recovery chapters and a summary of best available science for project selection and local policy efforts. Coordinate with Partnership staff to ensure that the local watershed chapter updates are in line with priorities outlined in the regional chapter and vice versa. The method of Contractor Selection has not been Determined at this time.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents