Similar Projects
Medical District Drainage Tunnel Extension at Ehrhardt Street
Bidding
$10,000,000 est. value
Charleston, SC 29425

Phase 3 Internal Drainage Improvements
Post-Bid
Isle of Palms, SC 29451

Fretwell Street Drainage Improvements
Post-Bid
North Charleston, SC 29406

Pepperhill Park Drainange Improvements
Results
North Charleston, SC 29419

Ezekiel Avenue Drainage Improvement CTC
Results
North Charleston, SC 29405

Folly River Park Retaining Wall
Infrastructure
Post-Bid
Folly Beach, SC 29439

Grimball Road Drainage Improvements
Results
SC

Construction Services Low Battery Restoration Project - Phase II
Results
Charleston, SC 29401

Royall Avenue Drainage Improvements
Results
Mount Pleasant, SC 29464

Dorchester Road Drainage Improvements
Results
$467,620 est. value
North Charleston, SC 29418

34th and Hartnett Drainage Project
Results
Isle of Palms, SC

Ashley Point Drainage Improvements
Infrastructure
Results
$109,782 est. value
Charleston, North Charleston, SC 29407

On-Call Ditch Digging Services for Various Locations
Infrastructure
Results
Mount Pleasant, SC

Coral Reef Drive Drainage Improvement Project
Infrastructure
Results
Charleston, SC

Pipe Repair-Charleston County
Infrastructure
Results
SC

Last Updated 11/22/2021 10:06 AM
Project Title

Forest Hills Pipe Lining

Physical Address View project details and contacts
City, State (County) North Charleston, SC   (Charleston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $922,127
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will involve lining approximately 3,800 LF of existing Corrugated Metal Drainage Pipe (CMP) with Cured in Place Pipe (CIPP) or Centrifugally Cast Concrete Pipe (CCCP) in the Forest Hills subdivision within the City of North Charleston. The existing CMP storm drainage system is located along the rear lot lines of residential properties; therefore, coordination with property owners and utility companies will be required to provide pipe inspections, spot repairs, new drain structure concrete tops, residential fence removal and replacement, removal of vegetation, pipe outfall stabilization, pipe lining, cleanup and all other appurtenances as shown on the drawings and as specified. Cleaning and video inspections of the lined stormwater systems will be required prior to and after the lining has been completed.

Details

Division 02 - Existing Conditions.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents