Similar Projects
Northwestern Division Regional $115M Section 8(A) SB Set-Aside IDIQ MATOC
New Construction
Design

Northwestern Division Regional $115M Section 8(A) SB Set-Aside IDIQ MATOC
New Construction
Design

Design-Build Non-Kinetic Operations Facility and Defense Courier Station, Offutt AFB
New Construction - 430,000 SF
Bidding
$200,000,000 to $500,000,000 est. value
Offutt AFB, NE

Nebraska Army National Guard Bellevue Readiness Center (Milcon)
New Construction - 95,000 SF
Bidding
$32,000,000 to $33,000,000 est. value
Bellevue, NE 68123

Offutt AFB Security Campus
New Construction - 30,300 SF
Post-Bid
$50,000,000 to $90,000,000 est. value
Offutt Air Force Base, NE

Entry Control Point Support
New Construction, Renovation, Demolition
Post-Bid
Offutt AFB, NE 68113

GTS Transient Training Officers Quarters Construction 640
New Construction - 6,550 SF
Bidding
$2,000,000 est. value
Hastings, NE

GTS Breach Training Facility
New Construction
Post-Bid
Hastings, NE

CATS-M Parachute Rigging Facility Addition
Addition - 565 SF
Post-Bid
Mead, NE

GTS Transient Training Enlisted Barracks
New Construction - 6,600 SF
Post-Bid
Hastings, NE 68901

NC3 Alert Campus
New Construction
Post-Bid
Offutt Air Force Base, NE

Last Updated 06/22/2022 01:48 AM
Project Title

NEARNG - Kearney NGRC Latrine Remodel

Physical Address View project details and contacts
City, State (County) Kearney, NE   (Buffalo County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes all labor, equipment, tools, materials, travel, and licenses required to remodel the latrine/shower areas of the Kearney Readiness Center built in 1996. Project will consist of removal of finishes, concrete, limited masonry and new construction of masonry, shower accessories, repair/replacement of interior finishes, painting, HVAC, electrical and plumbing

Details

Military Facility, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents