Similar Projects
Brooksville United Methodist Church - Painting
Alteration
Post-Bid
Brooksville, ME 04617

Exterior E and G Painting
Alteration
Post-Bid
Farmington, ME

Traffic Paint of City Streets
Infrastructure
Results
$43,750 CJ est. value
Waterville, ME 04901

Fleet Painting Fleet Maintenance Facility Exterior
Alteration
Results
Bangor, ME 04401

Exterior Auxiliary Building Painting
Alteration
Post-Bid
Farmington, ME

Painting Police Department Exterior
Renovation
Results
$19,981 CJ est. value
Bangor, ME 04401

Roadway and Parking Lot Striping
Infrastructure
Post-Bid
$70,000 CJ est. value
Bangor, ME 04401

Pavement Markings
Infrastructure
Results
$24,800 CJ est. value
Portland, ME 04101

Painting the Sugarloaf Outdoor Center Buildings
Renovation
Post-Bid
$140,000 CJ est. value
Carrabassett Valley, ME 04947

Crack Sealine in the Towns of Jackman, Moose River, and Solon, Township of Sandy Bay, Township D, and Plantation of Dennistown
Infrastructure
Results
$98,331 CJ est. value
Jackman, ME 04945

Pavement Markings Longitudinal Street Lines
Infrastructure
Post-Bid
$40,000 CJ est. value
Houlton, ME 04730

2023 Bridge Street Lining
Infrastructure
Results
$111,850 CJ est. value
Westbrook, ME 04092

White Painted Pavement Marking Lines
Infrastructure
Post-Bid
$60,000 CJ est. value
Hancock, ME 04605

Crack Sealing - Regions 4 and 5
Infrastructure
Results
$470,755 CJ est. value
Alton, ME 04468

Bridge Paint Projects - Fairfield, Guilford and Corinth - Regions 2 and 4
Infrastructure
Results
$739,189 CJ est. value
Fairfield, ME 04937

Last Updated 05/03/2023 03:13 PM
Project Title

Interstate 95 and Us Route 1 Bridge Paint Projects - Island Falls, Houlton, Sherman and Monticello - Region 5

Physical Address View project details and contacts
City, State (County) Portage Lake, ME 04768   (Aroostook County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,490,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The lowest responsive bidder must demonstrate previous successful completion of projects of a similar size and scope to be considered for the award of this contract. Description: Maine Federal Aid Project No. 2514700 WIN 025147.00, 2514900 WIN 025149.00, 2515700 WIN 025157.00, 2515900 WIN 025159.00, 2545100 WIN 025451.00, 2553900 WIN 2553900, 2554500 WIN 025545.00, 2554700 WIN 025547.00, 2553700 WIN 025537.00 Location: In Aroostook County, [stand Falls: Route 159 (Bridge No. 6175) over Interstate 95 approximately 0.64 of a mile east of Old Patten Road. Belvedere Road (Bridge No. 6174) over Interstate 95 approximately 0.63 of a mile northwest of Sherman Street. Houlton; Interstate 95 over U.S. Route | (Bridge No, 6098 and 1382) approximately 0.30 of a mile south of Exit 302.Sherman: Interstate 95 over Route 158 (Bridge No. 1406 and 6168) approximately 0.47 of a mile north of the Benedicta Road. Interstate $5 (Bridge No. 1407 and 6167} over Benedicta Road approximately 0.02 of a mile south of Exit 264. Monticella: U.S. Route 1 (Bridge No. 2542) over North Branch Meduxnekeag River approximately 0.22 of a mile north of School Street. Scope of Work: Interstate 95 and U.S Route | Bridge paint projects plus other incidental work. For general information regarding Bidding and Contracting procedures, contact George Macdougall at (207) 624-3410. For Project-specific information fax all] questions to Project Manager Devin Anderson at (207) 624-3431, use electronic RFI form or email questions to RFI- Contracts MDOT@ maine.gov, project name and identification number should be in the subject line. Questions received after 12:00 noon of Monday (or if that Monday is a state holiday, Friday) prior to bid date will not be answered. Bidders shall not contact any other Departmental staff for clarification of Contract provisions, and the Department will not be responsible for any interpretations so obtained. TTY users call Maine Relay 711. Each Bid must be made upon blank forms provided by the Department and must be accompanied by a bid bond at 5% of the bid amount or an official bank check, cashier's check, certified check, certificate of deposit, or United States postal money order in the amount of 5% of the bid amount, payable to Treasurer, State of Maine as a Bid guarantee. A Contract Performance Surety Bond and a Contract Payment Surety Bond, each in the amount of 100 percent of the Contract price, will be required of the successful Bidder. This Contract is subject to all applicable Federal Laws. This contract is subject to compliance with the Disadvantaged Business Enterprise program requirements as set forth by the Maine Department of Transportation. The right is hereby reserved to the MaineDOT to reject any or all bids. MEDOT - Interstate 95 and Us Route 1 Bridge Paint Projects - Island Falls, Houlton, Sherman and Monticello - Region 5 We now accept electronic bids for bid packages posted on the website. Electronic bids do not have to be accompanied by paper bids. Please note: The Department will accent a facsimile of the bid bond; however, the original bid bond must then be received at the MDOT Contract Section within 72 hours of the bid opening. Until further notice, dual bids (one paper, one electronic) will be accepted, with the paper copy taking precedence.

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents