Similar Projects
Reported | 03/07/2020 12:00 AM |
Project Title | Dixie Pump Station By-Pass Replacement |
Physical Address | View project details and contacts |
City, State (County) | Birch Run, MI (Saginaw County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of constructing a force main for Birch Run Township along Dixie Highway, crossing Dixie Highway, and an existing easement along a private drive parallel to Bogart Drain. The force main will connect to the existing Dixie Pump Station and the existing Birch Run Township Pump Station. Principal items of work include but are not limited to: 1,500 Ft Directionally Bored, 6 inch, Force Main 1 Ea Inserta- Valve 2 Ea Connection to existing Force Main 1 Ea Sanitary Manhole Outside Drop |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |